Technical Services - Elimination Of Architectural Barriers

CodiUDescripcióPreu
RE0446u

Writing project to eliminate barriers on housing

Writing implementation plan for the removal of architectural barriers to housing. Consisting of technical visits for data collection, rise of the current study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes trip to a maximum distance of 20 km, visit of the technical inspection of façade memory document specification, budget, annex install scaffolding, and all the plans needed to be able to put into action the works.

339,63 €
RE0448u

Writing project on removing barriers building (one elevator)

Writing implementation plan for the elimination of architectural barriers on a building with one elevator. Consisting of technical visits for data collection, rise of the current study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes trip to a maximum distance of 20 km, memory document specification, budget, and all the plans needed to be able to put into action works.

339,63 €
RE0449u

Writing project on removing barriers building (2 elevators)

Writing implementation plan for the elimination of architectural barriers on a building with two elevators. Consisting of technical visits for data collection, rise of the current study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes trip to a maximum distance of 20 km, memory document specification, budget, and all the plans needed to be able to put into action works.

501,64 €
RE0450u

Writing removal project on building barriers (3 lifts)

Writing implementation plan for the elimination of architectural barriers on a building with three lifts. Consisting of technical visits for data collection, rise of the current study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes trip to a maximum distance of 20 km, memory document specification, budget, and all the plans needed to be able to put into action works.

568,71 €
RE0451u

Writing removal project on building barriers (4 elevators)

Writing implementation plan for the elimination of architectural barriers on a building with 4 lifts. Consisting of technical visits for data collection, rise of the current study and assessment of existing needs and approach of the work aimed at the elimination of architectural barriers. Includes trip to a maximum distance of 20 km, memory document specification, budget, and all the plans needed to be able to put into action works.

620,20 €
RE0452u

Project management to eliminate barriers on building (1 elevators)

Jobs for the location of the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with one elevator. Includes: one visit weekly to work, drafting additional documents that may be required to detail any element of work, monitoring of work certifications, broadcast the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

257,22 €
RE0453u

Project management to eliminate barriers on building (2 elevators)

Jobs for the location of the works carried out in the implementation plan for the elimination of architectural barriers in a building with two plurifamilar lift. Includes: one visit weekly to work, drafting additional documents that may be required to detail any element of work, monitoring of work certifications, broadcast the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

344,39 €
RE0454u

Project management Removal about building barriers (3 lifts)

Jobs for the location of the works carried out in the implementation plan for the elimination of architectural barriers in a building with three plurifamilar lift. Includes: one visit weekly to work, drafting additional documents that may be required to detail any element of work, monitoring of work certifications, broadcast the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

380,48 €
RE0455u

Project management to eliminate barriers on buildings (4 lifts)

Jobs for the location of the works carried out in the implementation plan for the elimination of architectural barriers in a building with four plurifamilar lift. Includes: one visit weekly to work, drafting additional documents that may be required to detail any element of work, monitoring of work certifications, broadcast the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

408,19 €
RE0456u

Study Health and Safety barriers removal (one elevator)

Work relating to the drafting of the Health and Safety Study for works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

119,42 €
RE0458u

Study of Safety and Health elimination of barriers (3 lifts)

Work relating to the drafting of the Health and Safety Study for works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with three lifts, according to what is' established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

190,90 €
RE0460u

Study Waste Management elimination barriers (one elevator)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

66,85 €
RE0461u

Study Waste Management elimination barriers (2 elevators)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with two elevators, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

76,74 €
RE0462u

Study Waste Management elimination barriers (3 lifts)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with three lifts, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

80,82 €
RE0463u

Study Waste Management elimination barriers (4 elevators)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 4 lifts plurifamilar, according to what is' established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

83,97 €
RE0464u

Health and Safety Coordination removal of barriers (one elevator)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

180,05 €
RE0465u

Health and Safety Coordination removal of barriers (2 elevators)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with two elevators plurifamilar, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

274,33 €
RE0466u

Health and Safety Coordination of removing barriers (3 lifts)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 3 lifts plurifamilar, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

313,40 €
RE0467u

Health and Safety Coordination removal of barriers (4 elevators)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with 4 lifts plurifamilar, according with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

343,35 €
RE0468u

Waste Management Coordination removal of barriers (one elevator)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers in a building with one elevator plurifamilar, in according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

79,13 €
RE0469u

Waste Management Coordination removal of barriers (2 elevators)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with two elevators, of according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

85,69 €
RE0470u

Waste Management Coordination removal of barriers (3 lifts)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with 3 lifts, of according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

88,41 €
RE0471u

Waste Management Coordination removal of barriers (4 elevators)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the elimination of architectural barriers plurifamilar in a building with 4 lifts, in according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

90,48 €
RE0472u

Fee elimination of barriers on technical building (one elevator)

For technical work for the elimination of architectural barriers on a building with one elevator. Consisting of technical visits for data collection, rise of the current study and evaluation of identified deficiencies and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting of the annexes required, writing study health and safety, preparation of study waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

1.042,30 €
RE0473u

Fee elimination of barriers on technical building (2 elevators)

For technical work for the elimination of architectural barriers on a building with two elevators. Consisting of technical visits for data collection, rise of the current study and evaluation of identified deficiencies and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting of the annexes required, writing study health and safety, preparation of study waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

1.452,77 €
RE0474u

Fee elimination of barriers on technical building (3 lifts)

For technical work for the elimination of architectural barriers on a building with three lifts. Consisting of technical visits for data collection, rise of the current study and evaluation of identified deficiencies and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting of the annexes required, writing study health and safety, preparation of study waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

1.622,72 €
RE0475u

Fee Elimination of barriers on buildings (4 lifts)

For technical work for the elimination of architectural barriers on a building with 4 lifts. Consisting of technical visits for data collection, rise of the current study and evaluation of identified deficiencies and approach of the work aimed at the elimination of architectural barriers, rehabilitation project drafting, drafting of the annexes required, writing study health and safety, preparation of study waste management, direction of the works, coordination of health and safety coordination and management of waste. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

1.753,19 €