Technical Services - General

CodiUDescripcióPreu
RE0154u

Hearing an expert on public body (distance <20 km)

Hearing an expert on public body (judicial or administrative bodies, professional associations, etc.) to query or collect information or documents and various procedures, including moving to a maximum distance of 20 km.

47,16 €
RE0155u

Appearance before a magistrate expert (distance <20 km)

Hearing an expert in judicial body as a result of a subpoena in the presence of a magistrate or his representative (in hearing recognition or in situ) to answer questions or clarifications, including waiting time and travel to a maximum distance of 20 km.

120,66 €
RE0156u

Further recognition or visual inspection (distance <20 km)

Further recognition or visual inspection of buildings, land, plots, urban development, etc., even going to a maximum distance of 20 km.

120,66 €
RE0157u

Technical advice on legal proceedings (distance <20 km)

Technical advice in the preparation of documentation of legal proceedings by filing a complaint, or ask to make another expert or similar, which involved only the expert as a consultant and not directly to the proceedings, including travel at a maximum distance of 20 km.

120,66 €
RE0158u

Writing report and opinion

Editorial and Opinion Report, consisting of the written statement of the circumstances observed in recognition farms, buildings, documents, etc., or the consideration of the issue is considered with technical explanations, economic, etc. ., and the opinion on the issue submitted for consideration and justified on the basis of the report.

525,00 €
RE0160u

Writing a report and opinion on housing

Writing report and opinion for housing, consisting of the written statement of the circumstances observed in recognition of the property, with technical explanations, economic, etc., and the opinion on the issue submitted for consideration and justified on the basis of the report. Includes: displacement in a metropolitan area to a maximum distance of 20 km and visit for expert inspection of the property.

565,38 €
RE0161u

Review and analysis of technical documentation

Review and analysis of technical documentation (reports, opinions, laboratory studies, measurements and budgets, assessments, reports, plans, specifications, order books, studies and safety plans, structural calculations, planning documents, etc. ) with a medium level of complexity.

105,00 €
RE0162u

Economic valuation report or opinion for

Economic valuation justified repair diseases, deficiencies amendment, etc., as an inseparable part of an expert opinion, which complements. Whereas a maximum of six items valued with or without decomposition.

131,25 €
RE0533u

Implementation and testing plan creeks in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom Concrete structures in existing buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the criteria of the technical editor. As guidance and prior assessment, consider the following works to be executed, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building: - 6 units of extraction and trial testimony concrete pillar or beam (PT + CM). 1 per unit area. - 24 units for determining the speed of propagation of ultrasound beams and pillars. 4 units per zone. - One to study the correlation between ultrasound and concrete witnesses. - 24 units for determination section beam, their characteristics and condition of the concrete (CM). 4 units per zone. - 72 units for determining beam section and its condition (CV). 12 units per zone. - 72 units for determining and armor section in pillar or beam (CV + CD). 12 units per zone. - 2 units for determining the geometry of a forging. One unit for every three zones. - 2 units for determining the geometry of a shoe fundamentals. One unit for every three zones. - 2 units for the determination of geometry and composition of building facade. One unit for every three zones. - 2 units for the determination of geometry and composition of deck building. One unit for every three zones. - 6 units of extraction and micro test tubes in concrete beams (PT). 1 per unit area. - 2 units for the determination of resistance to traction pulling anchor. One unit for every three zones. - 2 units for the determination of resistance to shear pulling anchor. One unit for every three zones. - 1 units for report writing and compilation of results and coves. 1 unit for 20 zones. Includes preparation and aid work and replacement of deleted items. Not included: auxiliary means for heights greater than 3.5 m or replacement coatings.

6.457,24 €
RE0534u

Implementation and testing plan creeks in residential building (20 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 20 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom Concrete structures in existing buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the criteria of the technical editor. As guidance and prior assessment, consider the following works to be executed, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building: - 6 units of extraction and trial testimony concrete pillar or beam (PT + CM). 1 per unit area. - 24 units for determining the speed of propagation of ultrasound beams and pillars. 4 units per zone. - One to study the correlation between ultrasound and concrete witnesses. - 24 units for determination section beam, their characteristics and condition of the concrete (CM). 4 units per zone. - 72 units for determining beam section and its condition (CV). 12 units per zone. - 72 units for determining and armor section in pillar or beam (CV + CD). 12 units per zone. - 2 units for determining the geometry of a forging. One unit for every three zones. - 2 units for determining the geometry of a shoe fundamentals. One unit for every three zones. - 2 units for the determination of geometry and composition of building facade. One unit for every three zones. - 2 units for the determination of geometry and composition of deck building. One unit for every three zones. - 6 units of extraction and micro test tubes in concrete beams (PT). 1 per unit area. - 2 units for the determination of resistance to traction pulling anchor. One unit for every three zones. - 2 units for the determination of resistance to shear pulling anchor. One unit for every three zones. - 1 units for report writing and compilation of results and coves. 1 unit for 20 zones. Includes preparation and aid work and replacement of deleted items. Not included: auxiliary means for heights greater than 3.5 m or replacement coatings.

6.457,24 €
RE0535u

Implementation and testing plan creeks in residential building (50 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 50 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom Concrete structures in existing buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the criteria of the technical editor. As guidance and prior assessment, consider the following works to be executed, according to a quantified value estimated average equivalent to 12 units of inspection for each inspection area of ​​the building: - 6 units of extraction and trial testimony concrete pillar or beam (PT + CM). 1 per unit area. - 24 units for determining the speed of propagation of ultrasound beams and pillars. 4 units per zone. - One to study the correlation between ultrasound and concrete witnesses. - 24 units for determination section beam, their characteristics and condition of the concrete (CM). 4 units per zone. - 72 units for determining beam section and its condition (CV). 12 units per zone. - 72 units for determining and armor section in pillar or beam (CV + CD). 12 units per zone. - 2 units for determining the geometry of a forging. One unit for every three zones. - 2 units for determining the geometry of a shoe fundamentals. One unit for every three zones. - 2 units for the determination of geometry and composition of building facade. One unit for every three zones. - 2 units for the determination of geometry and composition of deck building. One unit for every three zones. - 6 units of extraction and micro test tubes in concrete beams (PT). 1 per unit area. - 2 units for the determination of resistance to traction pulling anchor. One unit for every three zones. - 2 units for the determination of resistance to shear pulling anchor. One unit for every three zones. - 1 units for report writing and compilation of results and coves. 1 unit for 20 zones. Includes preparation and aid work and replacement of deleted items. Not included: auxiliary means for heights greater than 3.5 m or replacement coatings.

10.430,75 €