Technical Services - Rehabilitation Cranes

CodiUDescripcióPreu
RE0190u

Writing facade rehabilitation project (10 IU)

Writing implementation plan for the restoration of a facade with 10 units in operation inspection. Consisting of technical visits for data collection, rise of the current study and assessment of existing conditions and planning work aimed at the restoration of the facade. Includes trip to a maximum distance of 20 km, visit of the technical inspection of façade memory document specification, budget, annex install scaffolding, and all the plans needed to be able to put into action the works.

436,84 €
RE0193u

Project management rehabilitation cranes (10 IU)

Jobs for the location of the works carried out in execution project for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection. Includes: one visit weekly to work, drafting additional documents that may be required to detail any element of work, monitoring of work certifications, broadcast the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

263,23 €
RE0196u

Study on Safety and Health Rehabilitation cranes (10 IU)

Work relating to the drafting of the Health and Safety Study for works carried out in the implementation plan for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection, according the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

136,50 €
RE0401u

Health and Safety Coordination facade rehabilitation (10 IU)

Work relating to Health and Safety Coordination according to the Health and Safety Study prepared for the works carried out in the implementation plan for the rehabilitation of plurifamilar facade of a building with 10 units in operation inspection in accordance with the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

216,91 €
RE0404u

Waste Management Coordination facade rehabilitation (10 IU)

Work relating to Waste Management Coordinator, according to the Waste Management Study prepared for the works carried out in the implementation plan for the rehabilitation of a building facade plurifamilar involving 10 units inspection in accordance with the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

98,59 €
RE0407u

Fees on technical rehabilitation cranes (10 IU)

Technical work for the restoration of a facade with 10 units in operation inspection. Consisting of technical visits for data collection, rise of the current study and assessment of existing conditions and planning work aimed at the restoration of the facade renovation project drafting, drafting Annex scaffolding writing health and safety study, writing study waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

746,54 €