Technical Services - Comprehensive Rehabilitation

CodiUDescripcióPreu
RE0171u

Writing Multifamily building rehabilitation project (10 IU)

Writing implementation plan for the rehabilitation of a building plurifamilar involving 10 units of inspection. Consisting of drafting and assessment of the supplementary report from the building, study and assessment of the tastings executed (if applicable) and approach of the work aimed at repairing pathologies detected in structure, roofs, facades and installations . Includes trip to a maximum distance of 20 km, visits of experts for inspection of the property, the report document specification, budget, and all the plans needed to be able to put into action works. (With a minimum intensity of inspection 80%).

1.523,66 €
RE0417u

Construction management of comprehensive rehabilitation (10 IU)

Jobs for the location of the works carried out in execution project for the comprehensive rehabilitation of a building plurifamilar involving 10 units of inspection. Includes: one visit weekly to work, drafting additional documents that may be required to detail any element of work, monitoring of work certifications, broadcast the final certificate of work and drafting of the final document of the project work , containing the final state of the works.

548,11 €
RE0422u

Health and Safety Study of comprehensive rehabilitation (10 IU)

Work relating to the drafting of the Study of Safety and Health for the works carried out in the implementation plan for the comprehensive rehabilitation of a building plurifamilar involving 10 units of inspection in accordance with the established in Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

146,09 €
RE0426u

Study Waste Management comprehensive rehabilitation (10 IU)

Work relating to the drafting of the Study of Waste Management for the works carried out in the implementation plan for the comprehensive rehabilitation of a building plurifamilar involving 10 units of inspection in accordance with the established in Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

94,44 €
RE0430u

Waste Management Coordination comprehensive rehabilitation (10 IU)

Work relating to Waste Management Coordination according to the study prepared for the works carried out in the implementation plan for the comprehensive rehabilitation of a building plurifamilar involving 10 inspection units, according to the provisions of Royal Decree 105/2008, February 1, 2008, the Ministry of the Presidency, which regulates the production and management of construction and demolition waste.

94,44 €
RE0435u

Health and Safety Coordination comprehensive rehabilitation (10 IU)

Work relating to Health and Safety Coordination according to the study prepared by the Health and Safety works carried out in the implementation plan for the comprehensive rehabilitation of a building of 10 units plurifamilar involving inspection of according to the provisions of Royal Decree 1627/97 of 24 October, the Ministry of the Presidency.

285,51 €
RE0439u

Fees technical rehabilitation of buildings (10 IU)

Technical work for the comprehensive rehabilitation of a building with 10 units in operation inspection. Consisting of technical visits for data collection, rise of the current study and evaluation of identified deficiencies and approach of the work aimed at the rehabilitation of the building renovation project drafting, drafting of the annexes required, writing study health and safety, preparation of study waste management, construction management, performance management, coordination of health and safety, waste management and coordination. Includes: displacement in a metropolitan area to a maximum distance of 20 km.

3.240,36 €
RE0443u

Execution of comprehensive rehabilitation (10 IU)

Jobs for the location of execution of the works carried out in execution project for the comprehensive rehabilitation of a building plurifamilar involving 10 units of inspection. Includes: one weekly visit at work, control and verification of the receipt of products and materials on site, checking the reconsideration and the correct execution of works according to the project, building control certificates and certificate final broadcast of work.

548,11 €
RE0533u

Implementation and testing plan creeks in residential building (10 IU)

Running campaign coves and testing laboratory accredited in building with concrete structure for a building with 10 units of inspection, based on a plan drawn up in accordance with the 'Guide to the Inspection and Evaluation Bathroom Concrete structures in existing buildings' by the Valencian Institute of Building IVE (DRB 05/09) and the criteria of the technical editor. As guidance and prior assessment, consider the following works to be executed, according to a quantified value estimated average equivalent to 10 units of inspection for each inspection area of ​​the building: - 6 units of extraction and trial testimony concrete pillar or beam (PT + CM). 1 per unit area. - 24 units for determining the speed of propagation of ultrasound beams and pillars. 4 units per zone. - One to study the correlation between ultrasound and concrete witnesses. - 24 units for determination section beam, their characteristics and condition of the concrete (CM). 4 units per zone. - 72 units for determining beam section and its condition (CV). 12 units per zone. - 72 units for determining and armor section in pillar or beam (CV + CD). 12 units per zone. - 2 units for determining the geometry of a forging. One unit for every three zones. - 2 units for determining the geometry of a shoe fundamentals. One unit for every three zones. - 2 units for the determination of geometry and composition of building facade. One unit for every three zones. - 2 units for the determination of geometry and composition of deck building. One unit for every three zones. - 6 units of extraction and micro test tubes in concrete beams (PT). 1 per unit area. - 2 units for the determination of resistance to traction pulling anchor. One unit for every three zones. - 2 units for the determination of resistance to shear pulling anchor. One unit for every three zones. - 1 units for report writing and compilation of results and coves. 1 unit for 20 zones. Includes preparation and aid work and replacement of deleted items. Not included: auxiliary means for heights greater than 3.5 m or replacement coatings.

6.457,24 €