PreuK/prices

Search this site
  • Inici
  • Inicio
  • Home
  • Accueil

// Main menu

  • Presentation
  • Rating Price
  • Instructions
    • Instructions and queries
    • Want to work with us?
    • What is the validation of a price?
    • Nomenclature and criteria
    • How to create the basis of a new record
    • Creating a base price
    • How to create a new price list
    • Creating a new justification for a price
    • How to update prices on the web
  • Dossiers
  • Authors and validators prices

// Contact

+34 961 135 438
preuk@rehabi-li-tar.com

// Coordination

Joaquim Iborra Posadas


Site created by 
www.rehabi-li-tar.com


Creative Commons License
This site by Rehabi-li-tar is licensed under a Creative Commons License

REXXXX


  • re00xx
    • 4/6/6 chamber glazing, glass.
    • Aid raised a palette of up to 3 m² interior carpentry
    • Aids palette to wedge three major closures m².
    • Aluminum sliding second 100X115 cm with PVC shutters.
    • Aluminum sliding second 115X120 cm with PVC shutters.
    • Aluminum sliding second 130 X 135 cm with PVC shutters.
    • Aluminum sliding two 140x140 cm with PVC shutters.
    • Aluminum sliding two 80x85 cm, blind.
    • Armed concrete slab 12 cm in pit lift.
    • Armor sanitized with manual brushing
    • Batter swirls nice view with cement mortar.
    • Booting down / gutter material unspecified
    • Built in stone cladding stepped ladder.
    • Cala inspection of reinforced concrete pillar or beam.
    • Ceiling plaster board, rib of 100x60 cm
    • Chopped exterior wall / interior cement mortar, thickness less than or equal to 3 cm
    • Compaction with vibrating tamper soils means
    • Demolition ceramic tile flooring, electric hammer.
    • Demolition concrete slab, thickness 10/12 cm.
    • Demolition mass concrete slab, 10 cm thick.
    • Demolition of Catalan roof and attic of envanets counter with jackhammer.
    • Demolition of ceramic flooring.
    • Demolition of ceramic tiles with manual means
    • Demolition of concrete slab beams
    • Demolition of empty container
    • Demolition of factory coated interior partition, 4/5/7 cm thick.
    • Demolition of interior partition factory coated, perforated brick 11 cm thick.
    • Demolition of interior partition factory coated, solid brick 5 cm panderete.
    • Demolition of natural stone flooring.
    • Demolition of paving tiles.
    • Demolition of plaster ceiling fixed
    • Demolition of plaster ceiling removable plates.
    • Demolition of recovery ridge, less than 20 m
    • Demolition of solid brick wall
    • Demolition terrazzo flooring, electrical hammer.
    • Dismantling of old tile curve recovery. height <20 m
    • Door insulated galvanized, white lacquered 700x1945
    • Double glazing standard 4/6/6 with printed glass Clarglas.
    • Drill 12/16 mm steel plate 10 mm.
    • Empresillat PNL-beam 30x40cm 100.10 mm
    • Empresillat PNL-pillar 40x40 cm 100.10 mm
    • Factory fitted solid wall for hoop attached.
    • False plaster beam, front and 20x30 cm tray.
    • Fill crack with mortar sika Monotop 612.
    • Finishing synthetic enamel on wood with steel handrails on both sides.
    • Forward vertical plaster instead of ceiling level continuous 20 cm
    • Front panel dual-blade profiled sheet steel with insulation in between.
    • Garnish with good views plaster vertical surface
    • Injection threaded rod galvanized steel 12 mm.
    • Insulation for inflation, from the inside, in air chambers closing double blade factory.
    • Lifted coating plaster / mortar cracks in interior strip width 20 cm.
    • Lifted collector buried PVC pipe.
    • Lifted kitchen furniture
    • Lowering of ground open manually, 12:40 m thick, on hard
    • Microfiber mesh protection vertical work
    • Objects fall protection canopy for protection of sidewalk. With rent for one month.
    • Opening runoff on ceramic brick in hand
    • Partition inner coating for ceramic brick factory LH-11.
    • Partition inner coating for ceramic brick factory LH7.
    • Perforated face brick pieces / cm 2 plaque.
    • Perforated Gypsum vertical.
    • Placement of natural stone formation threshold ramp access to the lobby.
    • Plastering base with cement mortar good view.
    • Plastering cement mortar base, mestrejat.
    • Plastic paint on plasterboard
    • Plastic paint white interior
    • Provision collecting water canal
    • Rain partition wall dividing plates shaped asphalt.
    • Raised shower stall
    • Raised skylight 3 to 6 m² without use
    • Reinforcing wrought IPE-100 to 3.50 m. Includes preliminary work and shoring.
    • Reinforcing wrought IPE-120 to 3.5 m. Includes preliminary work and shoring.
    • Reinforcing wrought IPE-140 up to 4 m. Includes preliminary work and shoring.
    • Reinforcing wrought IPE-160 to 3.5 m. Includes preliminary work and shoring.
    • Rental basket lift articulated 26 m. height.
    • Rental basket lift articulated 36/42 m. height.
    • Repair occasional song wrought lining, width 35 cm.
    • ROCKWOOL system of direct trasdoses of gypsum plasterboard with insulation incorporated in facade closings.
    • Running creek inspection wrought ceiling
    • Scissor platform to height of 15 meters and a capacity of 1000 kg (1 d)
    • Silicate coating painting outdoors
    • Skirting piece ceramic adhesive placed C1.
    • Skirting piece of porcelain, placed adhesive C1.
    • Statement of ceramic skirting
    • Statement window, up to 3 m² with manual means.
    • Stripping paint carpentry full of steel.
    • Survey grid up to 3 m²
    • Tall profile IPE100 / 200 grinder with manual work.
    • Tasting inspection basis.
    • Tasting inspection plaster coating.
    • The crushed material bonding the tiles
    • Tile porcelain tiling, placed with adhesive C1.
    • Tiles of ceramic tiles with cement mortar, as extended.
    • Tiling BALDOSA Catalan, cantilevered forged.
    • Tiling porcelàniques placed tile adhesive cement glue.
    • Waterproof impregnation on absorbent surfaces.
    • Waterproofing covered with polyurethane paint, armed.
    • Waterproofing drainage culvert on the terrace
    • Waterproofing of the coronation of the parapet wall, width 15 cm.
  • re01xx
    • ABC multipurpose fire extinguisher 6 kg-efficiency 21A 113B.
    • Acrylic plastic paint on exterior walls. Facades.
    • Aid for masonry structural recognition
    • Aids palette for the implementation of coves (10 IU)
    • Aluminum door lobby, two folding leaves 90 + 60 / fixed upper 1500x2700 mm.
    • Appearance before a magistrate expert
    • Appearance of an expert body in public
    • Appraisal and valuation of real estate building, land or premises (1 UI)
    • Assembling and dismantling scaffolding tubular facade, 250m².
    • Assembling and dismantling shelter for pedestrians. Section 15 ml.
    • Carpentry, 2 sliding balcony 1300x2450 mm., No blind.
    • Chopped beam underside wrought by Mecanoviga reinforcement system.
    • Concrete crack injection with epoxy resin.
    • Dedication of a technical drawing of a graphic section
    • Dedication of a technical writing section, section or annex budget
    • Dedication of a technical writing section, section or annex of memory
    • Dedication of a technical writing section, section or annex specification
    • Dedication of a technician in a workshop, including travel
    • Dedication of a technician in data collection or a current inspection unit, without displacement
    • Dedication of a technician recognition ocular inspection unit of a building or premises without displacement
    • Demolition of ceramic Escopidora width 25 cm.
    • Demolition of reinforced concrete floor with metal beams.
    • Demolition of simple metal ladder.
    • Dismantling and assembly platform suspended. 2-8 ml
    • Displacement of a technician (distance intervals of 10 km or fraction)
    • Drafting building rehabilitation project (1 UI)
    • Drafting building rehabilitation project (10 IU)
    • Drafting building rehabilitation project (20 IU)
    • Drafting building rehabilitation project (50 IU)
    • Economic valuation report or opinion for
    • Editorial energy certification (1 UI)
    • Editorial energy certification (10 IU)
    • Editorial energy certification (20 IU)
    • Editorial energy certification (50 IU)
    • Editorial Study Waste Management rehabilitation cranes (1 UI)
    • Editorial Study Waste Management rehabilitation cranes (10 IU)
    • Editorial Study Waste Management rehabilitation cranes (20 IU)
    • Emergency lighting in common areas, 155 Lux IP42 luminaire.
    • Escopidora Capri limestone 25x2 cm.
    • Formation of water drip in front forged.
    • Further recognition, data capture, inspection or face action, including travel
    • Further work on the health and safety coordinator, including travel
    • Galleries and balconies on areas not habitable, with waterproofing asphalt sheets.
    • Health and Safety Coordination rehabilitation façade (1 UI)
    • Healthy lining in the sill terraces. sup 30%.
    • Healthy structural concrete beam underside.
    • Measures for safety and health at work
    • Mounting IPE-scale metal layer 120 and compression. and 15 cm.
    • Perforated gypsum underside of the beam
    • Placing anchor plate steel S-275-JR, 250x250x10 mm.
    • Portable fire extinguisher dry ice CO2 efficiency 34B of 2 kg.
    • Project management rehabilitation cranes (1 UI)
    • Project management rehabilitation cranes (10 IU)
    • Project management rehabilitation cranes (20 IU)
    • Project management rehabilitation cranes (50 IU)
    • Raised outside woodwork. up to 3 m².
    • Receipt exterior. Up to 3 m².
    • Renovation of municipal license of occupation of a dwelling
    • Rental basket lift articulated 18/21 m. height.
    • Rental PTD scissors lift of 18 m. height.
    • Rental suspended platform. 2-8 ml.
    • Rental tubular scaffold cranes 30 days. Surface 250 m².
    • Repair or replacement parts ceramic socket.
    • Review and analysis of technical documentation
    • Roof and metal beams IPE-160 compression layer.
    • Roof not passable self protected
    • Running forged horizontal shoring
    • Sealing cracks in concrete, with thermoplastic material.
    • Sewn static cracks in ceramic brick walls.
    • Steel fire doors galvanizado.RF one 120-sheet 900X200 cm.
    • Stripping metal railings surface, solvent ice.
    • Study of Safety and Health Rehabilitation cranes (1 UI)
    • Study of Safety and Health Rehabilitation cranes (10 IU)
    • Study of Safety and Health Rehabilitation cranes (20 IU)
    • Study of Safety and Health Rehabilitation cranes (50 IU)
    • Supply and installation anchor plate HERMS
    • System Thermocal DBBLOK thermal insulation of facades and mineral coating.
    • Tasting inspection armor pillar
    • Technical advice on legal proceedings
    • Tiles on concrete or cement mortar support, adhesive C2.
    • Tour director's work force, including travel
    • Training stepped ceramic staircase.
    • Transport and removal of suspended platform. 2 ml.
    • Transport and withdrawal of tubular scaffolding facade. 250 m².
    • Transport of inert materials and / or concrete container.
    • Transportation of inert waste metal and / or wood container.
    • Vertical lift disabled ENIER ENI Enines 1200x950.
    • Visit the work of director of implementation, including travel
    • Wall factory load half foot thick.
    • Waste Management Coordination rehabilitation façade (1 UI)
    • Waste Transport mixing container 4 m³
    • Writing Assessment Report of the Building IEEV.CV (1 UI)
    • Writing project management and rehabilitation cranes (1 UI)
    • Writing rehabilitation project cranes (1 UI)
    • Writing rehabilitation project cranes (10 IU)
    • Writing rehabilitation project cranes (20 IU)
    • Writing rehabilitation project cranes (50 IU)
    • Writing report and opinion
    • Writing report and opinion (1 UI)
    • Writing supplementary report IEC Building (1 UI)
  • re02xx
    • 60x30x2 cm natural stone tiles, cement mortar, as extended.
    • Aids palette to outer wedge carpinterias <3 m²
    • Assembling and dismantling scaffolding hanging in courtyard
    • Assembling and dismantling scaffolding hanging in exterior.
    • Blind doors, hardwood melamine, 203x82.5x3.5 cm.
    • Calculation and sizing of a structure (10 UI)
    • Ceramic tile flooring 31x31 cm thick layer without socket.
    • Chopped coating plastering.
    • Chopped plastering cement mortar in interior walls.
    • Clad with natural stone slabs fixed with adhesive cement.
    • Cleaned floors of small beams and structural repair.
    • Coating step natural stone Crema Levante.
    • Coating with thin plastic paint drop in internal Repassos
    • Control of welding, for penetrating liquids in structural reinforcement.
    • Dedication of a technical design interior architecture
    • Dedication of a technical drawing program needs
    • Dedication of a technical issue certificate
    • Dedication of a technical oversight and layout of documents
    • Dedication of a technician in the current uprising
    • Dedication of a technician to design constructive solution
    • Dedication of specialized technical inspection, survey and calculation of structure
    • Dedication of the technical documentation online registration
    • Demolition of bent wood wrought
    • Demolition plated natural stone, placed with mortar.
    • Dismantling basin with pedestal, but recovered.
    • Dismantling bath, but recovered.
    • Dismantling of kitchen furniture set, but recovered.
    • Dismantling toilet, but recovered.
    • Down lacquered steel storm D120
    • Drafting implementation plan development (20 IU)
    • Each time a technical scope of regulations
    • Editorial electricity installation project execution (20 IU)
    • Editorial fire protection installation project execution (20 IU)
    • Editorial project management and repair construction element (1 UI)
    • Editorial Study Waste Management rehabilitation cranes (50 IU)
    • EF-90 fireproof insulation mortar vermiculite, pumped projected.
    • Emergency light IP42 70lux
    • Escopidora limestone 10x2 cm, with washes.
    • Evened plastered with cement mortar.
    • Execution of geotechnical study and writing (20 IU)
    • Execution repair construction element (1 UI)
    • Factory armed concrete block 40x20x10, resistance R10.
    • False ceiling with aluminum slats on balconies.
    • Flat roof waterproofing and flooring tile.
    • Forged unidirectional inclined reinforced concrete rim 25 + 5 cm beam autoresistent T18.
    • Galvanized metal grille for ventilation, 20x20 cm, exteriors.
    • Gypsum plastering, repair of beams forged
    • Health and Safety Coordination repair construction element (1 UI)
    • Health and Safety Plan (1 UI)
    • Healthy indoor stone walls viewed
    • Inner leaf closing crane with LH-7 + PE-40 insulation.
    • Interior electrical installation for single family
    • Issuance of descriptive technical certificate for notarial registration (1 UI)
    • LH-brick partition sheet 7, closing of gaps interns
    • Management application for aid for the execution of works
    • Metal reinforcement concrete pillar 25x25 cm, with PNL40.4
    • Mirror moon colorless 3mm
    • Modeling the behavior of a structure (10 UI)
    • Monolayer coating for facades, pillars and forged ahead
    • Natural stone skirting Crema Levante saltacavall.
    • Natural stone skirting. Crema Levante 18x2 cm.
    • Perforated cladding layer rendering.
    • Preparation of technical and economic feasibility report for the rehabilitation of a residential area (20 IU)
    • Project management in repair construction element (1 UI)
    • Project management in repair construction element (1 UI)
    • Prosthesis wooden frames fiberglass.
    • Recessed downlight luminaire types. 250 mm.
    • Registration ceiling frame and plate 50x50 cm, plaster
    • Reinforcing beam in wrought with profile IPE-140
    • Repair Cabot beam wooden frames with carbon fiber.
    • Replacing sewer overflow balcony.
    • Rise of tile curve recovery.
    • Scratching coating must vigueta existing wooden surface.
    • Security glazing 6/8/3 + 3. transparente.
    • Service delivery and removal, portable container 4.5 m³
    • Skirting tiles 7x31 cm, placed adhesive C2.
    • Solera T1 mass concrete, 10 cm thick, finished bearing.
    • Staff time managing administrative proceedings
    • Strengthening collar based on concrete pillar 25x25 cm, with PNL40.4
    • Stripping paint or varnish existing surface vigueta wood.
    • Study on Safety and Health in repair construction element (1 UI)
    • Study on Waste Management in repair construction element (1 UI)
    • Tasting inspection underside forged beam. Aluminosis.
    • Terrazzo tile flooring 40x40 cm medium grain without polishing.
    • Test check of drainage system
    • Test check of water supply network
    • Testing of sealing covers up to 100 m²
    • Tightness testing of facades, area of ​​3 square meters.
    • Tiles 20x40 on stoneware factory acreage with cement mortar.
    • Transport debris in authorized verteder
    • Treatment of surface finish in interior marble pavement.
    • Ventilation exhaust duct forced local PVC-tube 125.
    • Washes in shots with ceramic piece with washes
    • Washes over sill piece ceramic washes
    • Waste Management Coordination repair construction element (1 UI)
    • Writing plumbing installation project execution (20 IU)
    • Writing project execution gas installation (20 IU)
    • Writing project execution telecommunications installation (20 IU)
    • Writing project installation thermal energy (20 IU)
    • Writing repair project construction element (1 UI)
  • re03xx
    • Acrylic exterior coating
    • Administrative management application, communication, analysis, etc.
    • Articulated lift up to 16 m. height.
    • Assembling and dismantling scaffolding hanging standardized
    • Balcony mechanical ventilation with extractor Silent S & P 100 m³ / h.
    • Blanco Macael marble flooring, finished polished and polished.
    • Booting struggling with reed ceiling plaster.
    • Ceilings with insulation on mineral wool
    • Ceramic tile flooring replacement for 30x30. with thick.
    • Changing down inside PVC-160 and B-lined masonry.
    • Chopped for external walls cleaned surface by 30%.
    • Chopped underside beams forged in plaster.
    • Cleaning facade plastered with mortar.
    • Coating with thin plastic paint drop in Repassos interiors.
    • Continuous ceiling plasterboard N13.5 with perimeter molding.
    • Covered with waterproofing LBM-40 FP mineral autoprotegida
    • Crushed and replacement gypsum plaster underside forged
    • Crushed concrete surface
    • Demolition mortar base layer for flooring, 50 mm thick.
    • Demolition of existing reinforcement IPE120-140
    • Demolition of existing reinforcement profile IPE120-140
    • Demolition of river curved beams forged in
    • Demolition of self-supporting network of gypsum plasterboard.
    • Detachable ceiling plaster plates 60x60 with white vinyl.
    • Diesel articulated platform PAD32, HA32PX, height 32 m.
    • Emergency light IP42 70lux
    • Escopidora allistador, limestone 10x2 cm, with washes.
    • Escopidora with ceramic washes in open balconies
    • False ceiling fixed plate 60x60 cm decorated in refuezo structure.
    • False ceiling plaster boards continuous 15 mm, with auxiliary structure.
    • False ceiling plaster plates fixed 100x60 smooth and simple perimeter molding.
    • Flat roof, passable
    • Gutter seen circular section of galvanized steel
    • Healthy anchors railing and repair factory work. Railings of balconies. Main facade.
    • Healthy and repair front forged rim 30 cm.
    • Healthy sills and wall waterproofing coronation.
    • Healthy start on concrete pillars. Mortar structure.
    • Impact of rental scaffolding and hanging canopy, exterior
    • Impermabilizacón covered with two LBM-40-FP layer formation on slopes and o.g. sifònics sinks.
    • Impregnating sealer on soportes transparent rigid vinyl.
    • Laminated wood beams section 8x18 cm.
    • Leveling layer covered with mortar cemeno, thickness 20 mm.
    • Lifted lowering fiber cement with waste management.
    • Lining song with ceramic tiles and wrought opening meeting.
    • Lowering health series B indoors with PVC pipe 110.
    • Lowering health series B indoors with PVC-pipe 125.
    • Lowering health series B indoors with PVC-pipe 160.
    • Lowering of water evacuation tube sheet of zinc, 80 mm in diameter.
    • Matt plastic paint inside Horizontal
    • Measures on waste management in work
    • Monolayer coating on railings and wrought fronts.
    • Opening of empty wall factory interns for reinforcements
    • Opening race in ceramic brick
    • Pavement tile glazed stoneware 31x31 thick layer without socket.
    • Picado and repositioned in plaster plastered underside of forged
    • Pitched roof covered with tile. Termochip base and Texaplac.
    • Plaster molding of 2.7x4.7x103 cm, for decoration of the ceiling.
    • Porch canopy protection street. No monthly rental.
    • Promastic fiber coating for finish rolling.
    • Promastic fiber coating, for newly tread.
    • Proof of service sealing cover
    • Protection of interior furnishings
    • Rain gutters and downspouts rose
    • Reconstruction of the element in forging intervigado
    • Reinforcing beam of wood with metal xapons 8 mm thick
    • Reinforcing wrought IPE120-140-160 profile.
    • Reinforcing wrought profile IPE-120/140
    • Reinforcing wrought wooden its upper face by metal parts.
    • Repair roof spoiler
    • Replacing Bonera horizontal PVC-110, dimensions 250x250 mm.
    • Replacing tiles to 15x15 tiles, supported on brick wall.
    • Restoration and consolidation of moldings, imposts, rosettes, etc.
    • Restoration of support from balcony area 1.50 m².
    • Rough stone waterproofing coating on outdoor scaffolding.
    • Sealing cracks and fissures widespread brick
    • Sealing expansion joint with elastic polyurethane putty F-25.
    • Security glazing 6/8/3 + 3, vidrio transparente.
    • Self-leveling mortar with Pavimento acabado tread.
    • Sewn cracks with steel staples.
    • Sewn static coating with epoxy mortar on brick.
    • Sikaelastic 450-445 waterproofing roof with gargoyles and PVC.
    • Skirting tiles 7x31 cm, placed adhesive C2.
    • Slip flooring tiles 41x41 cm, taken with Sikabond T-8.
    • Steel anchor plate 40x40 cm, thickness 4 mm.
    • Steel anchor rod diameter of 12 mm and 250 mm longuitud resins.
    • Structural reinforcement forged pipe system Herms CR DIT 289 / R 100x100x4.
    • Structural reinforcement forged pipe system Herms CR DIT 289 / R, 100x100x4.
    • Structural repair of concrete in front of forged 35 cm.
    • Sumidero sifònica for bathrooms, terraces or patios
    • Supply and installation anchor plate Herms DIT-289.
    • Support for reinforcement beam with UPN-160
    • Tiled ceramic tile 25x40 cm, soporte a brick factory with mortar cemento.
    • Training during lightened concrete 11 cm thick
    • Training leveled base in cement roof
    • Treatment of facades with mounting solvent
    • Treatment waterproof face brick facade
    • Treatment waterproof face brick facade
    • Waterproofing balconies / galleries Sikabond with T-8.
    • Waterproofing balconies floors with polyurethane Sikalastic 490-T
    • Waterproofing dividing from adjoining terrace.
  • re04xx
    • Chopped and disposal ceramic slab for strengthening Mecanoviga MVV
    • Demolition layer compression emptying breasts traditional roof
    • Demolition of balconies Trays
    • Director of the rehabilitation works (1 UI)
    • Director of the rehabilitation works (10 IU)
    • Director of the rehabilitation works (20 IU)
    • Director of the rehabilitation works (50 IU)
    • Document management or administrative or technical consultation
    • Execution rehabilitation (1 UI)
    • Execution rehabilitation (10 IU)
    • Execution rehabilitation (20 IU)
    • Execution rehabilitation (50 IU)
    • Flat roof is not ventilated
    • Health and Safety Coordination in building rehabilitation (10 IU)
    • Health and Safety Coordination in building rehabilitation (20 IU)
    • Health and Safety Coordination in building rehabilitation (50 IU)
    • Health and Safety Coordination installing elevator (lift 1)
    • Health and Safety Coordination lift installation (3 lifts)
    • Health and Safety Coordination lift installation (4 elevators)
    • Health and Safety Coordination lift installation (two lifts)
    • Health and Safety Coordination rehabilitation façade (10 IU)
    • Health and Safety Coordination rehabilitation façade (20 IU)
    • Health and Safety Coordination rehabilitation façade (50 IU)
    • Occupational Safety and Health Coordination Building renovation (1 UI)
    • Perforated trays balconies
    • PreuK RE0477
    • PreuK RE0479
    • PreuK RE0480
    • PreuK RE0481
    • PreuK RE0483
    • PreuK RE0484
    • PreuK RE0485
    • PreuK RE0486
    • PreuK RE0488
    • PreuK RE0491
    • PreuK RE0493
    • PreuK RE0494
    • PreuK RE0495
    • PreuK RE0496
    • PreuK RE0498
    • Privacy passive RF-90 Rock wool.
    • Project management in project to install a lift (elevator 3)
    • Project management in project to install an elevator (lift 1)
    • Project management project in elevator installation (4 elevators)
    • Project management project in elevator installation (two lifts)
    • Project management reform and adaptation (1 UI)
    • Repair mortar coating descrostament
    • Repair tray balcony
    • Staff time to an external entity in administrative management, including displacement
    • Study of Health and Safety at installing elevator (lift 1)
    • Study of Safety and Health Rehabilitation (1 UI)
    • Study on Safety and Health in lift installation (3 lifts)
    • Study on Safety and Health in lift installation (4 elevators)
    • Study on Safety and Health in lift installation (two lifts)
    • Study on Safety and Health in rehabilitation (10 IU)
    • Study on Safety and Health in rehabilitation (20 IU)
    • Study on Safety and Health in rehabilitation (50 IU)
    • Study on Waste Management in installing elevator (lift 1)
    • Study on Waste Management in lift installation (3 lifts)
    • Study on Waste Management in lift installation (4 elevators)
    • Study on Waste Management in lift installation (two lifts)
    • Study on Waste Management in rehabilitation (10 IU)
    • Study on Waste Management in rehabilitation (20 IU)
    • Study on Waste Management in rehabilitation (50 IU)
    • Study Waste Management Rehabilitation (1 UI)
    • Visit the work of coordinating waste management, including displacement
    • Waste Management Coordination rehabilitation building (1 UI)
    • Waste Management Coordination rehabilitation façade (10 IU)
    • Waste Management Coordination rehabilitation façade (20 IU)
    • Waste Management Coordination rehabilitation façade (50 IU)
    • Waste Management Coordinator building rehabilitation (10 IU)
    • Waste Management Coordinator building rehabilitation (20 IU)
    • Waste Management Coordinator building rehabilitation (50 IU)
    • Waste Management Coordinator in lift installation (3 lifts)
    • Waste Management Coordinator in lift installation (4 elevators)
    • Waste Management Coordinator in lift installation (two lifts)
    • Waste Management in coordination installing elevator (lift 1)
    • Writing and project management in removing barriers (3 lifts)
    • Writing and project management in removing barriers (4 elevators)
    • Writing and project management in removing barriers (two lifts)
    • Writing and project management level down to 0 in removing barriers (1 elevators)
    • Writing Assessment Report of the Building IEEV.CV (10 IU)
    • Writing Assessment Report of the Building IEEV.CV (20 IU)
    • Writing Assessment Report of the Building IEEV.CV (50 IU)
    • Writing project legalization (10 IU)
    • Writing project management and rehabilitation cranes (10 IU)
    • Writing project management and rehabilitation cranes (20 IU)
    • Writing project management and rehabilitation cranes (50 IU)
    • Writing project management and rehabilitation of building (10 IU)
    • Writing project management and rehabilitation of building (20 IU)
    • Writing project management and rehabilitation of building (50 IU)
    • Writing project management and renovation building (1 UI)
    • Writing project of reform and adaptation (1 UI)
    • Writing project to install a lift (4 elevators)
    • Writing project to install a lift (elevator 3)
    • Writing project to install an elevator (lift 1)
    • Writing project to install an elevator (two lifts)
    • Writing supplementary report building IEC (10 IU)
    • Writing supplementary report building IEC (14 IU)
    • Writing supplementary report building IEC (50 IU)
  • re05xx
    • 200 panoramic virtual tour to Google Street View Trusted
    • And structural characterization of materials in a pillar, beam or forged technology Radar PS 1000
    • Appraisal and valuation of real estate building, land or premises (10 IU)
    • Appraisal and valuation of real estate building, land or premises (20 IU)
    • Appraisal and valuation of real estate building, land or premises (50 IU)
    • Approved tubular scaffolding
    • Audiovisual installation for the digital broadcasting of an event in streaming (two speakers)
    • Cleaning cranes
    • Creation and design of municipal or intra Transparency Portal (445,000 inhabitants)
    • Dedication of a technical analysis review and a technical document
    • Dedication of a technical report writing, justifying, in effect, control or compliance
    • Demolish existing buried collectors, 110-125, patios and storage
    • Demolition of existing masonry chamber
    • Determination of a shoe geometry basics (CS)
    • Determination of geometry and composition of building facade (CF)
    • Determination of geometry and composition of deck building (CC)
    • Determination of resistance to shear pulling anchor
    • Determination of resistance to traction pulling anchor
    • Determination section and armor in pillar or beam (CA)
    • Determination section beam and its condition (CV)
    • Determination ultrasound propagation velocity pillars and beams (CU)
    • Determining characteristics of concrete beam (CM)
    • Determining the geometry of a forged (CG)
    • Dismantling and reinstalling air conditioning unit
    • Dismantling and reinstalling boiler, boiler or accumulator
    • Energy refurbishment of flat roof
    • Escopidora aluminum sheet lacquered
    • Extraction and testing of micro test tubes in concrete beams (PT)
    • Extraction and testing of witness concrete pillar or beam (PT)
    • Forensics step in secondary network of 60x70 cm
    • Grouting of brick facing
    • Implementation plan coves and tests in residential building (10 IU)
    • Implementation plan coves and tests in residential building (20 IU)
    • Implementation plan coves and tests in residential building (50 IU)
    • Installation of taking the floor of the building
    • Measurement and control of movement in cracks, joints, etc. (10 IU)
    • Municipal sanitation network connection
    • Notice of opening of workplace
    • Opening and digging ditches collectors buried
    • Opening and digging wells for new boxes
    • Opening of Commercial dividing bushing
    • Pericó walk cranes inside of 75x75 cm
    • Pericó walk down, 50X50 cm.
    • Preliminary Evaluation Report Writing IEP structure (1 UI)
    • Preliminary Evaluation Report Writing IEP structure (10 UI)
    • Preliminary Evaluation Report Writing IEP structure (20 UI)
    • Preliminary Evaluation Report Writing IEP structure (50 UI)
    • Preparation of a plan for training and dissemination of a municipal or intermunicipal Transparency Portal (445,000 inhabitants)
    • Preparation of support with chipped
    • PreuK RE0500
    • PreuK RE0512
    • PreuK RE0513
    • PreuK RE0515
    • PreuK RE0572
    • PreuK RE0590
    • PreuK RE0591
    • PreuK RE0592
    • PreuK RE0593
    • PreuK RE0598
    • PreuK RE0599
    • Public or private broadcasting a collective act, via Google Hangout (10 participants)
    • Public or private broadcasting a collective act, via Google Hangout (1000 participants)
    • Public or private broadcasting a collective act, via Google Hangout (60 participants)
    • PVC sewer pipe buried-315 mm, filled ditch
    • Raised pavements in interior premises
    • Registrale ceiling made of plasterboard with smooth hidden profiles
    • Registrale ceiling plaster cracked plates with hidden profiles
    • Reinforcing wrought IPE-180 to 3.5 m
    • Removed useless patio
    • Removing paint prexistents
    • Repairing damage to vertical surface
    • Replacement of drinking water connection
    • Replacement parts face brick
    • Replacing blind and, where applicable, reconstruction lintel
    • Replacing door balcony
    • Replacing pump
    • Report and collecting coves and results
    • Solving encounter and covered with vertical vents
    • Steel cross sections for functional replacement of forged
    • Study of correlation between ultrasound and witnesses concrete
    • Suite G Implementation of a corporate structure (100 users)
    • Suite G Implementation of a corporate structure (25 users)
    • Suite G Implementation of a corporate structure (5 users)
    • Survey and replacement sanitary, commercial
    • Technical advice on a topic structural construction
    • Technical assistance for repair or refurbishment interior (1 UI)
    • Technical assistance for the execution of a campaign of inlets (50 IU)
    • Technical assistance for urgent action (1 UI)
    • Training in information and communication technologies (ICT 200 students)
    • Training in information and communication technologies (ICT 30 students)
    • Training in information and communication technologies (ICT 60 students)
    • Training in the Google Apps Script programming (10 students)
    • Treatment against xylophagous insects in wooden elements (1 UI)
    • Treatment and painting existing metalwork
    • Treatment capillary moisture in existing factories
    • Treatment protection locksmith
    • Wiring and removal of foreign objects in front
    • Withdrawal awning in front
    • Writing for the inspection report and rapid assessment postcatàstrofe (50 IU)
  • re06xx
    • Actions under construction external control energy certification (1 UI)
    • Actions under construction external control energy certification (10 IU)
    • Actions under construction external control energy certification (20 IU)
    • Actions under construction external control energy certification (50 IU)
    • Preliminary external control energy certification (1 UI)
    • Preliminary external control energy certification (10 IU)
    • Preliminary external control energy certification (20 IU)
    • Preliminary external control energy certification (50 IU)
    • PreuK RE0600
    • Support external control legislation and urban planning at the design stage (1 UI)
    • Support external control legislation and urban planning at the design stage (10 IU)
    • Support external control legislation and urban planning at the design stage (20 IU)
    • Support external control legislation and urban planning at the design stage (50 IU)
    • Support for external control and quality documentation in project phase (1 UI)
    • Support for external control and quality documentation in project phase (10 IU)
    • Support for external control and quality documentation in project phase (20 IU)
    • Support for external control and quality documentation in project phase (50 IU)

Sign in|Recent Site Activity|Report Abuse|Print Page|Powered By Google Sites