RE0005

Plaster crushing to bouna view to the vertical wall

1,007,197,195,450,3375,80
B1 Construction Gypsum Trim a B1 in Buena Vista, on the vertical wall, up to 3 m high, instead of the previous placement of Anti -Calis mesh material, with lifeguards.
%01a%Auxiliary costs on the labor0,020,11
%02%Indirect costs0,030,21
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0009B1 construction plaster, according to UNE-EN 13279-1, D22, with P.P. Fiberglass, 5x5 mm light, flexible and imputable with time passing, 70 g/m² surface mass and 0.40 mm thick thick, to mount plastic and metal lifeguards, stable for a the action of sulfates.0,0278,851,42
MOU0001h1st plasterist officer. Professional level VIII (Source: IVE). / More information0,2117,933,773,770,21
MOU0002hOrdinary plasterist pawn. Professional level XII (Source: IVE). / More information0,1214,001,681,680,12
Written by Vicente Almudéver
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 31/05/2013
Zone València
Remarks:
..........
Validated by Francesc Company Gandia
Validated by date 15/10/2018
Remarks: Preu CYPE 9,13 €. Preu € 6,70 €. Preu ITEC 9.77 (sense comprovar) €.