Code | One | Description | Amount | Price (€) | Amount (€) | Impact of labor (€) | Labor (h) | Impact of labor (%) |
RE0017 | m² | Finish with synthetic enamel on steel carpentry, two -sided railings. | 1,00 | 16,55 | 16,55 | 8,72 | 0,50 | 52,69 |
| | Synthetic enamel, black, bright, on the iron or steel surface, cleaning and preparation of the surface to be painted, by manual means until it is exempt from fat, ends with two hands with synthetic enamel with a minimum film thickness dry 35 35 microns per hand (performance: 0.08 l/m²) | | | | | | |
%01a | % | Auxiliary costs on the labor | 0,02 | | 0,17 | | | |
%02 | % | Indirect costs | 0,03 | | 0,48 | | | |
| % | Estimation of the degree of difficulty or uncertainty (normal: 1.00) | 1,00 | | | | | |
REU0327 | l | Satin synthetic enamel, based on alchic resins with polyurethane, titanium biopoxide and extensors, lead exempt, black, applied with brush, roller or gun | 0,38 | 18,90 | 7,18 | | | |
MOU0003 | h | 1st Official Painter. Professional level X (Source: IVE). / More information | 0,40 | 17,93 | 7,17 | 7,17 | 0,40 | |
MOU0004 | h | Painter assistant. Professional level X (Source: IVE). / More information | 0,10 | 15,50 | 1,55 | 1,55 | 0,10 | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Written by Vicente Almudéver | | | | | | |
| | | | | | | | |
| | Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Update 27/11/2013 | | | | | | |
| | Zone València | | | | | | |
| | Remarks: | | | | | | |
| | .......... | | | | | | |
| | Validated by Francesc Company Gandia | | | | | | |
| | | | | | | | |
| | Validated by date 19/10/2018 | | | | | | |
| | Remarks: Preu CYPE 13,37 €. IVe Price (només un primer oficial) 5,28 €. Preu ITEC 12,03 €. Sense comprovar | | | | | | |
| | edit price | | | | | | |
|