CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0037

Threshold access ramp natural stone formation lobby.

1,0080,6480,6414,510,9017,99
Supply and installation of granite paving tiles Crystal White for external access threshold in the lobby, common parts 80x120x2 cm wide, polished finish; received with cement mortar, sand crumb M-5, made on site without retardants. Even training together continuous perimeter, of a width not less than 5 mm, in the limits with walls, pillars and exempt elevation level and, if necessary, partition boards or structural joints and expansion in existing support; grouting cement mortar joints, CG1 for meeting minimum (between 1.5 and 3 mm), with the same tone of the pieces and cleaning. Placed sloping ramp to set the 25% slope.
%01a%Ancillary costs of labor0,020,29
%02%indirect costs0,032,34
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0240National granite tile, Crystal White, 60x40x2 cm, polished finish, according to UNE-EN 12058.1,0555,6058,38
REU0113Mortar cement CEM II / B-P 32.5 N, waterproof, M-10 type, made on site with 380 kg / m³ and a cement volume ratio 1/4.0,04143,155,01
REU0237kgCement mortar joints, CG1 for meeting minimum between 1.5 and 3 mm, according to UNE-EN 13888.0,150,710,11
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,4517,938,078,070,45
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,4514,316,446,440,45
written by Vicente Almudéver
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 9/07/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 24/05/2017
observations: Preu Cype (col·locat en pla) RSP011 71,75 €. Preu IVE (marbre blanc Altea, col·locat en pla) ERSP1banfdc 52,07 €. Preu ITeC (pedra granítica nacional, col·locat en pla) E9B41375K8TY 128,75 €