CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0053m

Skirting piece ceramic adhesive placed C1.

1,007,617,613,590,2047,17
Supply and installation of ceramic glazed stoneware skirting of 7 cm, 3 € / m, received with cement adhesive for indoor use only, without any additional feature Ci, gray grouting cement mortar joints , CG1 for meeting minimum (between 1.5 and 3 mm), with the same tone of the pieces.
%01a%Ancillary costs of labor0,020,07
%02%indirect costs0,030,22
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0236kg0,110,350,04
REU0235m1,053,503,68
REU0237kg0,010,710,01
MOU0033hOfficial 1st tiler. Professional level VIII (Source: IVE). / More information0,2017,933,593,590,20
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 09/07/2013
zone València
observations:
..........
Validated by Francesc Company Gandia
Validated date 23/10/2018
observations: Preu Cype RSG020 6,56 €. Preu IVE (alçada 8 cm) ERSA23bba 6,23 €. Preu ITeC (alçada 10 cm) E9U341A1 6,81 € sense revisar.