REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (H)Job Maging Repercussion (%)
RE0055

Tiled with porcelain tiles, placed with adhesive C1.

1,0042,2842,2813,370,8031,62
Supply and placement of piracy with polished porcelain stoneware, 1/0 / - - (Marination, type 1; without additional requirements, type 0; without additional requirements, type - /), 40x40 cm, € 22 / m², receipts With normal cement adhesive, C1 without any additional function, gray, double glance. Even proportional part of the preparation of superficial plaster support or plates; Participate, cuts, PVC cantoners, and together; Refrure with white cement, L, BL-V 22.5, for the minimum Board (between 1.5 and 3 mm), color with the same tonality of the pieces; Finished and final cleaning. It does not count on the support base with a stressed cement mortar male.
%01a%Auxiliary costs on labor0,020,27
%02%Indirect costs0,031,22
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
REU0236kgAdhesive of normal cement, C1, according to UNE-EN 12004, gray color.6,800,352,38
REU0238mPVC corner in tiled corners.0,501,360,68
REU0233Porcelain stone ceramic tile 2/0 / - -, 41x41 cm, polished finish, € 22.00 / m², according to UNE-EN 14411.1,1022,0024,20
REU0230White cement slurrate 22.5 X.0,00157,000,16
MOU0033h1st plague official. Professional level VIII (Source: Ive). / More information0,4017,937,177,170,40
MOU0034hSander assistant. Professional level X (Source: Ive). / More information0,4015,506,206,200,40
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 09/07/2013
Zone València
Observations:
..........
Validated by Francesc Company Gandia
Validated with date 23/10/2018
Observations: Preu Cype RAG012 38,87 €. Preu IVE ERP12DAAAA 54,21 €. Preu ITEC (preu superior) E82C1P2K 37,82 € Sense revisar
Edit price