REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0068

Dismantling of old tile curve recovery. height <20 m

1,0010,2810,289,790,6595,23
Dismantling coverage ceramic tile old curve, and child items, ready to channel and hosts recovery of parts disassembled for possible reuse even stacked in place that is designated for this selection, sorting by size classes and condition, and cleanliness, placed less than 20 m, including security means and lifting load and unload with debris removal for subsequent transport to landfill.
%01a%Ancillary costs of labor0,020,20
%02%indirect costs0,030,29
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,2214,313,093,090,22
MOU0023hPawn specialist in construction. Professional XI (Source: IVE). / More information0,4315,506,706,700,43
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 11/03/2014
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 26/05/2017
observations: Preu Cype DQC040 21,32 €. Preu IVE DDDQ7a 6,51 €. Preu ITeC K215750A 20,35 €
Edit price