CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0070

Demolition mass concrete slab, 10 cm thick.

1,007,707,707,330,7695,19
Demolition of continuous mass concrete pavement 10 cm thick, with jackhammer, not including the demolition of the support base or damage the adjacent building elements. Even proportion of cleaning, gathering, removal and manual loading debris truck or container, excluding transport to the landfill, according NTE / ADD-13.
%01a%Ancillary costs of labor0,020,15
%02%indirect costs0,030,22
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0023hPawn specialist in construction. Professional XI (Source: IVE). / More information0,1415,502,172,170,14
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,2514,313,583,580,25
REU0348hCompressor diesel portable medium pressure 4 m / min.0,124,700,560,560,12
REU0184hJackhammer devastating0,254,081,021,020,25
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 05/11/2014
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 26/05/2017
observations: Preu Cype DRS070 10,41 €. Preu IVE DDDE1aa 10,99 €. Preu ITeC K2192311 11,49 €