REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0091

Front panel dual-blade profiled sheet steel with insulation in between.

1,0044,5444,5412,620,8628,33
Closing double leaf facade, exterior panel made of sheet steel S320 GD profiled ribbed galvanized 0.6 mm thick and 30 mm height of ridge insulation blanket glass wool hygroscopic not covered by one of its faces a veil of reinforced glass, according to UNE-EN 13162, 60 mm thick tray tray support inside ribbed galvanized steel sheet of 0.6 mm thickness, even proportion of cavalcaments, wastage and accessories hidden fastening and sealing elements and other work necessary for the formation of gaps, joints, corners, shots and meetings with other materials. Fully assembled, with removal of excess material and container cargo.
%01a%Ancillary costs of labor0,020,25
%02%indirect costs0,031,29
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0060Sheet ribbed steel profile UNE-EN 10346 S320 GD galvanized 0.6 mm thick and 30 mm height cresta.escripció the unit price.1,056,266,57
REU0061Glass wool blanket not a hygroscopic coated their faces with a veil of reinforced glass, according to UNE-EN 13162, 60 mm thick, thermal resistance of 1.5 m²K / W thermal conductivity of 0.04 W / (mK) insulation systems for double sheet metal.1,053,563,74
REU0062Tray ribbed galvanized steel sheet of 0.6 mm thickness, for use in multilayer closures.1,0516,5017,33
REU0063Completion side galvanized steel, thickness 0.6 mm, 500 mm development.0,344,451,51
REU0064uA self-tapping screw 6,5x70 mm stainless steel washer.1,500,500,75
REU0065mGasket sealing for steel sheets.0,420,900,38
REU0066uA self-tapping screw 4,2x13 mm stainless steel washer.2,050,050,10
REU0067hEquipment and auxiliary elements for electric welding.0,113,090,340,340,11
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,0514,310,720,720,05
MOU0011h1st Official editor industrial closures. / More information0,3517,936,206,200,35
MOU0012hAssistant editor industrial closures. / More information0,3515,505,365,360,35
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 31/05/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 2/06/2017
observations: Preu Cype FLA020 42,75 €. Preu IVE (amb aïllant PUR-50 mm) EFIL1beac 96,77 €. Preu ITeC E635G228 41,60 €. Preu ACAE UGEN_EO6PAF4 49,86 €.
Edit price