REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (H)Job Maging Repercussion (%)
RE0101u

Assembly and disassembly of tubular facade scaffolding, 250m².

1,001.996,881.996,88
Assembly and disassembly of normal tubular scaffolding, multidirectional types, up to 10 m maximum work height, formed by a hot galvanized steel tubular structure, without duplication of vertical elements and work platforms of 60 cm wide; For the execution of 250 m² facade, according to assembly plans, taking into account a maximum distance of 20 m between the download point of the materials and the point further away from the assembly. Even proportional part of the flexible assembly and disassembly network, mosquito nuts, 100% polyethylene, accessories, protection systems, anchors and replacement. Assembly, Dismantling and rent during the first month.
%01a%Auxiliary costs on labor0,02
%02%Indirect costs0,0358,16
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
REU0084uRepercussion, m², standardized tubular scaffolding, multidirectional types, 10 m high work height, consisting of a hot galvanized steel tubular structure, 48.3 mm in diameter and 3.2 mm thick, without duplication of Vertical elements, manufactured according to the quality requirements included in the UNE-EN ISO 9001 standard and complies with UNE-EN 12810 and UNE-EN 12811 standards; Composed of work platforms of 60 cm wide, arranged every 2 m in height, interior staircase with trapdoor, rear left-handed with two bars and bordering, and front railing with a bar; for the facade execution; Even a flexible network, monofilament mosquito net, 100% polyethylene.252,114,921.240,38
REU0085uRepercussion, for m², disassembly of normal tubular scaffolding, multidirectional type, 10 m high working height, constituted by a hot galvanized steel tubular structure, 48.3 mm in diameter and 3.2 mm thick, without Duplication of vertical elements, manufactured according to the quality requirements included in the UNE-EN ISO 9001 standard and complying with UNE-EN 12810 and UNE-EN 12811 standards; Composed of work platforms of 60 cm wide, arranged every 2 m in height, interior staircase with trapdoor, rear left-handed with two bars and bordering, and front railing with a bar; for the facade execution; Even a flexible network, monofilament mosquito net, 100% polyethylene.252,112,77698,34
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 31/05/2013
Zone València
Observations: Notes de l'autor?
..........
Validated by Josep Mestre Ruiz
Validated with date 5/06/2017
Observations: Cype de preus (muntatge i desmuntatge) 0XA130 € 1779,50. Preu IVE (muntatge i desmuntatge, Altura 8-12 m) MMAT3B (250m² x 6,85 € / m²) = 1712,50 €. Preu ITeca (muntatge i desmuntatge, alçada <= 2 m) L1213251 (250m² x 5,64 € / m²) = 1410 €. Preu ACAE (lloguer i instal·lació d'1 mes, alçada <8 m) PGENA04.0024 (250m² x 7,66 € / m²) = 1915 €.
Edit price