REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (H)Job Maging Repercussion (%)
RE0103u

Transport and removal of tubular facade scaffolding. 250 m².

1,00498,57498,57
Transport and elimination of normal tubular scaffolding, multidirectional type, up to 10 m maximum work height, formed by a hot galvanized steel tubular structure, without duplication of vertical elements and work platforms of 60 cm wide; For the execution of facade of 250 m².
%01a%Auxiliary costs on labor0,02
%02%Indirect costs0,0314,52
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
REU0087uRepercussion, for m², transportation to work and elimination of normal tubular scaffolding, multidirectional type, 10 m maximum work height, constituted by a hot galvanized steel tubular structure, 48.3 mm in diameter and 3.2 mm of thickness, without duplicity of vertical elements, manufactured according to the quality requirements included in the UNE-EN ISO 9001 standards and complying with UNE-EN 12810 and UNE-EN 12811 regulations; Composed of work platforms of 60 cm wide, arranged every 2 m in height, interior staircase with trapdoor, rear left-handed with two bars and bordering, and front railing with a bar; for the facade execution; Even a flexible network, monofilament mosquito net, 100% polyethylene.252,111,92484,05
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 31/05/2013
Zone València
Observations:
..........
Validated by Josep Mestre Ruiz
Validated with date 5/06/2017
Observations: Preu Cype 0xa120 493,73 €.
Edit price