REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0103u

Transport and withdrawal of tubular scaffolding facade. 250 m².

1,00498,57498,57
Transport and withdrawal of tubular scaffold standard, multi-type, up to 10 m maximum working consisting of tubular hot galvanized steel, vertical elements without duplication of work platforms and 60 cm wide; for execution of facade of 250 m².
%01a%Ancillary costs of labor0,02
%02%indirect costs0,0314,52
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0087uImpact for m², transportation to work and removal of tubular scaffold standard, multi-type, maximum height of 10 m work, consisting of tubular hot galvanized steel, 48.3 mm in diameter and 3 2 mm thick, without duplication of vertical elements manufactured according to the quality requirements of the standard UNE-EN ISO 9001 and comply with the UNE-EN 12810 and UNE-EN 12811; composite work platforms 60 cm wide, arranged every 2 meters in height with hatch staircase railing rear skirting and two bars, and front railing with a bar; cranes for execution; even flexible network type mosquito monofilament, polyethylene 100%.252,111,92484,05
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 31/05/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 5/06/2017
observations: Preu Cype 0XA120 493,73 €.
Edit price