REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0112

Alicado on cement or concrete mortar support, with C2 adhesive.

1,0032,0332,0320,951,3065,41
Supply and placement of allicado with enameled stoneware, 1/0/ -/e (wall, type 1; no additional requirements, type 0; outer, type -/e), 20x20 cm, 8 €/m², received with Improved improved cement adhesive, C2 without any additional, gray feature. Even proportional part of the surface preparation of the cement or the concrete mortar support; Renter, Cortes, Cantonereras de PVC and Together; Investing with the articular cement mortar with high resistance to the abrasion and absorption of reduced water, CG2, for the minimum articulation (between 1.5 and 3 mm), with the same hue of the pieces; Finished and final cleaning
%01a%Auxiliary costs on the labor0,020,42
%02%Indirect costs0,030,92
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0100kgImproved cement sticker, C2, according to UNE-EN 12004, Gray.3,000,411,23
REU0101mCorner PVC in the corners of tiles.0,010,500,01
REU0102Ceramic tile of the enamel 1/0/-/E, 20x20 cm, 8.00 €/m².1,058,008,40
REU0103kgCemented articular die with high resistance to the abrasion and absorption of reduced water, CG2, for the minimum joint between 1.5 and 3 mm, according to UNE-EN 13888.0,100,980,10
MOU0005h1st officer under construction. Professional level VIII (Source: IVE). / More information0,6517,9311,6511,650,65
MOU0006hOrdinary pawn under construction. Professional level XII (Source: IVE). / More information0,6514,319,309,300,65
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 13/06/2013
Zone València
Remarks:
..........
Validated by Josep Mestre Ruiz
Validated by date 6/06/2017
Remarks: CYPE RAG015 20,94 €. IVE Preu (15,53 €/m²) ERPA4BBFA 32,80 €. Preu ITEC (Preu mitjà Baldosa) E82B543K 28,47 €. ACAE PREU UIBMM071UM3J 28,37 €.
edit price