RE0114

Healthy sill lining on terraces. sup 30%.

1,0015,8115,8110,530,6466,60
Sanitized lining the parapets of terrace, consisting of chopped specific areas shabby and reconstruction dosing cement mortar 1: 6 even removal of excess material and cleaning.
%01a%Ancillary costs of labor0,020,21
%02%indirect costs0,030,45
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0104Mortar cement CEM II / B 32.5 N P-type M-5, made on site with 250 kg / m³ and a cement volume ratio 1/6.0,04115,504,62
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,3817,936,816,810,38
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,2614,313,723,720,26
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 6/06/2017
observations: Partides similars: Preu Cype (reparació de revestiment de morter amb defectes superficials, amb morter acrílic, en tota la seva superfície, per rebre acabat) RYY010 16,68 €. Preu IVE (sanejat petos i cassetó, amb reposició de làmina impermeabilitzant i cavallons, màxim 30% de la seva superfície) RQAP4a 37,41 €. Preu ITeC (sanejament de sòcol exterior amb arrebossat, en tota la seva superfície, amb capa d'acabat) 481RA133 89,85 €.