RE0122u

Aids palette for the implementation of bays (two UI)

1,00232,55232,55177,3311,0076,25
Aids palette for the execution and replacement of bays in a building with two inspection units, consisting of the execution of replacement and paint coating the affected area, size no greater than 0,50x0,50 m no contribution of finishing materials. Includes shift personnel and equipment, toilets, prior protection of the work area and removal of debris and cleaning. Not included: auxiliary to heights exceeding 7 meters or preparation of tasting (chopped coatings, opening holes in ceilings, etc.) or replacement of coatings and finishes.
%01a%Ancillary costs of labor0,023,55
%02%indirect costs0,036,67
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0180uAnd auxiliary equipment for the execution of tastings structural elements or building construction.1,0045,0045,00
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information5,5017,9398,6298,625,50
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information5,5014,3178,7178,715,50
observations:
It considers each inspection unit independent housing, local commercial use, warehouse, garage or any other use other than housing up to 200 m² of floor area or fraction thereof on the same level.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 19/03/2018
zone València
observations:
..........
Validated by Francesc Company Gandia
Validated date 23/10/2018
observations: Preu donat per constructor