REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0125

Demolition of reinforced concrete floor with metal beams.

1,0066,6566,6563,485,6695,24
Demolition of reinforced concrete with wrought unidirectional metal beams shaped type IPE-IPN, entrebigat of curved ceramic or concrete and concrete compression layer, media manuals jackhammer and compressor equipment flame cutting even raised pavement proportion of cleaning, gathering, removal and manual loading debris truck or container.
%01a%Ancillary costs of labor0,021,27
%02%indirect costs0,031,90
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0184hJackhammer devastating1,234,085,025,021,23
REU0185hCompressor diesel portable medium pressure 10 m / min.0,928,808,108,100,92
REU0182hTeam flame cutting with acetylene as fuel and oxygen as supporter of combustion.0,367,372,652,650,36
MOU0022hOfficial 1st welder. Professional level X (Source: IVE). / More information0,2517,934,484,480,25
MOU0023hPawn specialist in construction. Professional XI (Source: IVE). / More information1,4515,5022,4822,481,45
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information1,4514,3120,7520,751,45
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 7/06/2017
observations: Preu Cype (amb biguetes de formigó) DEH020 46,65 €. Preu IVE (forjat unidireccional formigó armat) DDDE4aa 62,80 €. Preu ITeC K2148AB1 27,24 €. Preu ACAE (amb biguetes de formigó) UGEN_E01DSH1 26,88 €.