REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0126

Transport of inert materials and / or concrete container.

1,0034,8134,81
Transport inert waste concrete, bricks, tiles and ceramic, produced in construction and / or demolition, with 4.2 m³ of container, landfill specific treatment facility construction and demolition waste from outside the work center or recovery or disposal of waste.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,031,01
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0187Cargo and container 4.2 m³ exchange for inert waste collection produced in concrete construction and / or demolition work placed at the foot of freight, including service delivery, rental and cost of disposal .1,0033,8033,80
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 7/06/2017
observations: Preu Cype GRA010 19,47 €. Preu IVE GGCR2abb 6,43 €. Preu ITeC (amb contenidor de 5 m³) E2R540E0 22,61 €. Preu ACAE UGEN_E01DTT2 12,97 €.
Edit price