RE0129

Wall factory load half foot thick.

1,0028,9128,9117,361,0460,05
Bearing wall, 1/2 foot thick factory perforated ceramic brick (honeycomb) to cover, 24x12x9 cm, received with cement mortar M-5, including scaffolding and auxiliary to a maximum height 3 m, removal of debris, cleaning and cargo container.
%01a%Ancillary costs of labor0,020,35
%02%indirect costs0,030,83
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0189uPerforated ceramic brick (honeycomb) to cover, 24x12x9 cm, according to UNE-EN 771-1.43,050,198,18
REU0104Mortar cement CEM II / B 32.5 N P-type M-5, made on site with 250 kg / m³ and a cement volume ratio 1/6.0,02115,502,19
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,6917,9312,4112,410,69
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,3514,314,954,950,35
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre ruiz
Validated date 7/06/2017
observations: Preu Cype FEF010 25,46 €. Preu IVE EFFC1bdfa 31,12 €. Preu ITeC (maó perforat 24 x 11,5 x 10 cm) K612E11K 38,02 €. Preu ACAE UGEN_E06LP2 22,52 €.