REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (H)Job Maging Repercussion (%)
RE0130m

Ceramic training directed on scale.

1,0019,7219,729,530,5748,33
Formation of staggered staircase with an empty ceramic brick received with M-5 cement mortar, slab or scale vault, as basis for the subsequent placement of staggering finish. Includes: Replacement and layout of the staggered in walls. Extended cord between the first step and the last one. Cleaning and wetting of the slab. Formation of staggering. Project measurement criterion: length of the axis of the route of the scale, measured horizontal encrojection.
%01a%Auxiliary costs on labor0,020,19
%02%Indirect costs0,030,57
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
REU0190uDouble empty ceramic brick, for coating, 33x16x7 cm, according to UNE-EN 771-1.31,000,206,20
REU0104Cement Dead CEM II / B-P 32.5 n Type M-5, prepared on site with 250 kg / m³ of cement and a volume ratio 1/6.0,03115,503,23
MOU0005h1st officer under construction. Professional level VIII (Source: Ive). / More information0,3817,936,816,810,38
MOU0006hOrdinary pawn under construction. Professional Level XII (Source: Ive). / More information0,1914,312,722,720,19
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 13/06/2013
Zone València
Observations:
..........
Validated by Josep Mestre Ruiz
Validated with date 7/06/2017
Observations: Preu Cype HYP010 € 17,96. Preu IVE EFFW4A 10,37 €
Edit price