Mounting IPE-scale metal layer 120 and compression. and 15 cm.

1,00114,54114,5433,322,2029,09
Training mounting scale metal singing 15 cm, consisting of: hot rolled steel joists UNE-EN 10025 S275JR, simple profiles, IPE 120, worked and assembled in the workshop, with surface preparation degree SA21 / 2 according to UNE EN ISO 8501-1 and subsequent application of two hands primer film with a minimum thickness of 30 microns dry by hand; Double bard cm ceramic 100x25x3,5 even proportion of special pieces; concrete compression layer 7 cm thick, made of concrete HA-25 / B / 20 / IIa work made with portable 250L mixer and poured manually, concrete volume 0.10 m³ / m², steel UNE B 500 S 10080 -EN zone reinforcement negative amount 1.8 kg / m³ and mesh 20x20 Ø 5-5 ME B 500 T 6x2,20 UNE-EN 10080 as armor division. Even assembling and dismantling the formwork system and proportional preparation edges, welds, cuts, trims, and repair work escapçadures few tweaks and / or damage arising for reasons of transport, handling or assembly, with the same degree of surface preparation and priming.
%01a%Ancillary costs of labor0,020,62
%02%indirect costs0,032,95
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0191Formwork system partially wooden recoverable by execution massissats media in forged metal beams and vaults, propped up properly, repayable in 50 uses, including 4.5 meters.0,2226,005,72
REU0173kgRolled steel UNE-EN 10025 S-275-JR simple piece of hot rolled series IPN, IPE, HEB, HEA, HEM and UPN, worked in the workshop, applied structural reinforcements.25,360,7920,03
REU0030kgPainting house TKROM can 25kg, primer antocorrosiva S / R Gray 411 or similar.1,222,092,55
REU0015kgSteel profiles B-500 S-6 / 16mm rods corrugated cut supplies on site.1,950,781,52
REU0193Ø 20x20 mesh ME 5-5 B 500 T 6x2,20 UNE-EN 10080.1,102,052,26
REU0194Production of concrete HA-25 / B / 20 / IIa in work with portable electric mixer 250L.0,12233,0027,96
REU0199uBard ceramic 100x25x3,5 cm.8,000,887,04
REU0182hTeam flame cutting with acetylene as fuel and oxygen as supporter of combustion.0,087,370,590,590,08
REU0067hEquipment and auxiliary elements for electric welding.0,153,090,460,460,15
MOU0024h1st Official editor estructurista cash. Professional level VIII (Source: IVE). / More information0,4517,938,078,070,45
MOU0025hAssistant editor estructurista cash. Professional level X (Source: IVE). / More information0,4515,506,986,980,45
MOU0022hOfficial 1st welder. Professional level X (Source: IVE). / More information0,2417,934,304,300,24
MOU0026hOfficial encofrador 1st structures and concrete professional level VIII .. (Source: IVE). / More information0,3217,935,745,740,32
MOU0027hAssistant estructurista encofrador and concrete. Professional level X (Source: IVE). / More information0,3215,504,964,960,32
RE0133uPlacing anchor plate steel S-275-JR, 250x250x10 mm.0,3042,6312,792,220,19
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 7/06/2017
observations: Preu Cype (només muntant d'escala i altiplans, sense graons) EAE010 7,14 € / kg
Edit price