REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0135u

Supply and installation anchor plate HERMS

1,0044,5844,585,660,3412,70
Supply and installation of anchor plate HERMS with four anchors 12 mm, arranged on concrete edge beam, drills and chemical anchor with epoxy resin or similar type DESA-CHEM, 12 mm galvanized threaded rod, nut and washer Flat on base regularized with mortar type resins AplicatecR4 or similar corrosion protection paint Thkrom or similar; unit fully placed, proportional means and scaffolding necessary aid, removal of excess material and final cleaning.
%01a%Ancillary costs of labor0,020,11
%02%indirect costs0,031,30
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0023uHERMS anchor plate.1,0025,0025,00
REU0150uHILTI drill bit TE-CX 8/17.0,088,900,71
REU0164mAM12x1000 HILTI threaded rod, galvanized 4.8.1,051,922,02
REU0163uFlat washer A13 / 24 galvanized.4,000,050,20
REU0162uM12 galvanized hex nut.4,000,090,36
REU0017uCartridge Save home, Chem, epoxy acrylate 410 ml.0,928,607,91
REU0031kgMortar structural resins, Aplicatec R4 product in bags of 25 kg.1,050,650,68
REU0030kgPainting house TKROM can 25kg, primer antocorrosiva S / R Gray 411 or similar.0,302,090,63
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,2217,933,943,940,22
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,1214,311,721,720,12
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 7/06/2017
observations:
Edit price