REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0137m

Sewn static cracks in ceramic brick walls.

1,0029,2229,2225,692,1587,92
Sewn static crack on brick ceramic staple by including corrugated steel B 500 S 10 mm in diameter and 30 cm long, 30 cm each placed crossing across the fissure, comprising: opening boxes ( as racing) perpendicular to the direction of the crack; cleaned, wet and abeurada of them, received staples in boxes with cement mortar and sand lightly added lime dosing 1: 0.5: 4, that there is no excessive shrinkage, placing staples and filling boxes to the level of the household and the fissure already sewn thixotropic repair mortar injection pressure control.
%01a%Ancillary costs of labor0,020,51
%02%indirect costs0,030,84
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0028hSpecialist sewn static palette. Professional level VII (Source: IVE). / More information0,7518,3613,7713,770,75
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,7514,3110,7310,730,75
REU0031kgMortar structural resins, Aplicatec R4 product in bags of 25 kg.2,200,651,43
REU0104Mortar cement CEM II / B 32.5 N P-type M-5, made on site with 250 kg / m³ and a cement volume ratio 1/6.0,00115,500,23
REU0015kgSteel profiles B-500 S-6 / 16mm rods corrugated cut supplies on site.0,670,780,52
REU0203hResin injection equipment0,301,220,370,370,30
REU0204hmechanical drill0,352,350,820,820,35
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 8/06/2017
observations: Preu Cype FFY030 26,87 €. Preu IVE RFFP1aca 33,10 €.
Edit price