CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0142m

Chopped beam underside wrought by Mecanoviga reinforcement system.

1,008,798,798,370,6895,22
Chopped plastering the walls in horizontal base slippers joists that have to be reinforced or to stop completely healthy eyes and clean the underside of the same for the correct connection between them and the system reinforcement used, even the proportion of necessary demolition of rivers entrebigat curved forged for the proper implementation of actions to reinforce the joists or similar Mecanoviga system, cleaning and loading debris collected walk load.
%01a%Ancillary costs of labor0,020,17
%02%indirect costs0,030,25
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,2217,933,943,940,22
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,2814,314,014,010,28
REU0204hmechanical drill0,182,350,420,420,18
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 8/06/2017
observations: Partides similars: Preu Cype (picat de revestiment de guix en parament interior horitzontal) DRF020 8,94 € / m². Preu IVE (picat d'arrebossat de guix en paraments horitzontals) DDDR6bb 8,03 € / m². Preu ITeC (repicat de enguixats) K2182301 6,64 € / m².