REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0142m

Forged the lower chopped face, for the mechanoviga reinforcement system.

1,008,798,798,370,6895,22
Chopped plaster on the horizontal walls of the base shoe base that will be strengthened or disinfected until they are completely seen and cleaned the lower face of them for the correct union between them and the reinforcement system used, even the part Necessary proportional proportion of the rivers of interruption of the vineyards of the slab for the correct execution of the actions of reinforcement of the visits with a mechanoviga system or the like, cleaning, collection and load of waste at the loading foot.
%01a%Auxiliary costs on the labor0,020,17
%02%Indirect costs0,030,25
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
MOU0005h1st officer under construction. Professional level VIII (Source: IVE). / More information0,2217,933,943,940,22
MOU0006hOrdinary pawn under construction. Professional level XII (Source: IVE). / More information0,2814,314,014,010,28
REU0204hMechanical drill0,182,350,420,420,18
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 13/06/2013
Zone València
Remarks:
..........
Validated by Josep Mestre Ruiz
Validated by date 8/06/2017
Remarks: Jocs similars: Preu CYPE (revestiment de guix a la paret interior horitzontal) DRF020 8,94 €/m². Preu Ive (guix de guix picat en parets horitzontals) DDDR6BB 8,03 €/m². Preu ITEC (relé d'Enjesados) K2182301 6,64 €/m².