REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0143m

Healthy structural concrete beam underside.

1,0018,2818,2812,820,9470,13
Healthy beam concrete or ceramic by demolition of coating existing court closures and interior partitions to testify against, clean the support to make thoroughly clean the concrete or the base of the shoe, sanitized areas stark corrosion, passivation the reinforcement with corrosion inhibiting primer Sika FerroGard-903 or similar restructuring with a mortar coating structural high initial resistance and controlled retraction or Sika Top Structurite Thor house or similar. Even small and auxiliary equipment required for its implementation, coatings similar to those that existed prior to the action and finishes. Fully executed.
%01a%Ancillary costs of labor0,020,19
%02%indirect costs0,030,42
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0141mPerforated gypsum underside of the beam1,003,683,683,500,37
REU0145kgSika Armatec top 110 Period-corrosion inhibitor and bonding can 4kg, three components: A + B + C.0,854,153,53
REU0031kgMortar structural resins, Aplicatec R4 product in bags of 25 kg.1,750,651,14
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,3217,935,745,740,32
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,2514,313,583,580,25
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 13/06/2013
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 8/06/2017
observations: Partides similars: Preu Cype (reparació estructural de bigueta de formigó mitjançant aplicació manual de morter de reparació de dos components a base de resina epoxi) EHY025 200,94 € / m². Preu IVE (reparació paraments de formigó) REHP31a 85,26 € / m². Preu ITeC (reparació paraments de formigó) K45RU520 190,85 € / m².
Edit price