REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (h)MANAGER MANAGEMENT REPERCUSSION (%)
RE0144

Execution of horizontal forged shoring

1,0021,8321,8319,351,2088,64
Execution of horizontal forging point, with free plant height of up to 3.5 m, composed of telescopic metallic pillars (average repercussion: 1.1 pillars / m2), amortizable in 25 uses and pine wood planks 7 x 15-20 cm, depreciable in 5 uses, placed as crossings and adapts in the base and capitals of the pillars. Includes: Preparation of the surface of support, rethinking and cutting of planks, placement of the pillars, installation and loading of the shoring, disassembly and removal of the shoring.
%01a%Auxiliary costs on labor0,020,39
%02%Indirect costs0,030,62
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
REU0211uTelescopic metallic strut, up to 3.5 m in height, depreciable in 25 uses1,100,700,77
REU0202Wooden board 7.6 x 15-20 cm, depreciable in 5 uses0,0144,100,66
REU0201kgPunta Steel for construction 17x70, box 3 kg.0,031,200,04
MOU0005hOfficer 1st under construction. Professional level VIII (Source: Ive). / More information0,6017,9310,7610,760,60
MOU0006hOrdinary pawn under construction. Professional Level XII (Source: Ive). / More information0,6014,318,598,590,60
Drafted by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 10/08/2020
Zone València
Observations:
..........
Validated by Joaquim Iborra Posadas
Validated with date 10/08/2020
Observations: Preu Cype 0PC010 30,73 €. Preu IVE DDCP1a 7,65 €. Preu ACAE UGEN_E01AA2 41,58 €.
Edit price