REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0173u

Drafting building rehabilitation project (1 UI)

1,003.460,213.460,212.726,11120,5078,78
Writing rehabilitation project execution for the first inspection unit, consisting of drafting and assessment of the supplementary report from the building, study and assessment of the coves executed (if any) and description of the solution repair of pathologies detected in structure, roofing, façades and facilities. Includes tours and travel, visit expert for inspection of the property, the report document specification, budget and plans.
%01a%Ancillary costs of labor0,024,40
%02%indirect costs0,0323,69
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0170uWriting supplementary report IEC Building (1 UI)1,001.148,751.148,751.083,4446,00
RE0174uDedication of a technical writing section, section or annex of memory6,0087,92527,52502,4424,00
RE0175uDedication of a technical writing section, section or annex specification2,0066,31132,62126,326,00
RE0176uDedication of a technical writing section, section or annex budget3,0087,92263,76251,2212,00
RE0177uDedication of a technical drawing of a graphic section4,0085,60342,40326,0816,00
RE0272uStaff time managing administrative proceedings0,5018,089,048,610,50
RE0275uEach time a technical scope of regulations1,0092,4092,4088,004,00
RE0276uDedication of specialized technical inspection, survey and calculation of structure1,00126,00126,00120,004,00
MOU0066hCoordinator / Technician. Professional Level II (Source: IVE). / More information4,0025,00100,00100,004,00
MOU0081hDirector / Technician. Professional Level II (Source: IVE). / More information4,0030,00120,00120,004,00
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.2,8690,00257,62
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.3,12100,00312,01
observations:
Not included under this heading the cost of coves and laboratory tests needed to write this project. It considers each inspection unit independent housing, local commercial use, warehouse, garage or any other use other than housing up to 200 m² of floor area or fraction thereof on the same level. Considers rehabilitation works aimed at activities designed to achieve structural and functional adequacy of the building.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 9/05/2018
zone València
observations: Partides relacionades: RE0168, RE0171, RE0172, RE0173.
..........
Validated by
profile
Validated date
observations:
Edit price