Code | One | Description | Amount | Price (€) | Amount (€) | Impact of labor (€) | Labor (h) | Impact of labor (%) |
RE0191 | u | Writing of facade rehabilitation project (20 UI) | 1,00 | 1.176,24 | 1.176,24 | 917,36 | 43,38 | 77,99 |
| | Drafting of the execution project for the rehabilitation of a facade with an intervention in 20 inspection units, consisting of the visit of the data technician, the current state rise, study and evaluation of the existing pathologies and description of the solution for the rehabilitation of the facade. Includes: visits and displacement, visit of the technician for the inspection of the facade, report of the document, specifications, budget, annex to install scaffolding, and all the necessary plans to be able to fulfill the works. | | | | | | |
%01a | % | Auxiliary costs on the labor | 0,02 | | 1,58 | | | |
%02 | % | Indirect costs | 0,03 | | 8,25 | | | |
| % | Estimation of the degree of difficulty or uncertainty (normal: 1.00) | 1,00 | | | | | |
RE0174 | u | Dedication of a technician to the writing of section, section or annex of memory | 1,44 | 87,92 | 126,24 | 120,24 | 5,74 | |
RE0175 | u | Dedication of a technician to the writing of section, section or annex of specifications | 1,44 | 66,31 | 95,21 | 90,69 | 4,31 | |
RE0176 | u | Dedication of a technician to the writing of section, section or annex of budget | 1,44 | 87,92 | 126,24 | 120,24 | 5,74 | |
RE0177 | u | Dedication of a technician to the preparation of graphic documentation of a section | 1,44 | 85,60 | 122,91 | 117,05 | 5,74 | |
RE0156 | u | Recognition visit, data collection, eye inspection or face -to -face intervention, even travel | 1,00 | 68,88 | 68,88 | 55,00 | 2,50 | |
RE0178 | u | Dedication of a technician to data taking or current state in an inspection unit, without displacement | 1,44 | 10,81 | 15,52 | 14,78 | 0,72 | |
RE0272 | u | Dedication of staff to administrative management of a file | 5,44 | 18,08 | 98,28 | 93,61 | 5,44 | |
RE0280 | u | Dedication of a technician to the supervision and layout of the documentation | 3,44 | 69,30 | 238,11 | 226,77 | 10,31 | |
MOU0066 | h | Technical coordinator. Professional level II (Source: IVE). / More information | 1,44 | 25,00 | 35,90 | 35,90 | 1,44 | |
MOU0081 | h | Technical director. Professional level II (Source: IVE). / More information | 1,44 | 30,00 | 43,08 | 43,08 | 1,44 | |
REU0763 | u | Average cost of professional liability insurance premiums, for every 1000 units of technical fee currency or fraction. | 1,00 | 90,00 | 90,00 | | | |
REU0762 | u | Average cost of rates and contributions for the management and visa of a file in a professional college, for every 1000 units of coin of technical fees or fraction. | 1,06 | 100,00 | 106,04 | | | |
| | Remarks: | | | | | | |
| | Each accessible and covered space is considered an independent inspection unit (home, shopping premises, warehouse, parking, common element or any other use), up to 200 m² of built area or fraction, at the same level . | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Written by Joaquim Iborra Posadas | | | | | | |
| | | | | | | | |
| | Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU | | | | | | |
| | | | | | | | |
| | | | | | | | |
| | Update 19/03/2018 | | | | | | |
| | Zone València | | | | | | |
| | Remarks: Partides relacionades: RE0185, RE0190, RE0191, RE0192. | | | | | | |
| | .......... | | | | | | |
| | Validated by | | | | | | |
| | Profile | | | | | | |
| | Validated by date | | | | | | |
| | Remarks: | | | | | | |
| | edit price | | | | | | |
|