REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0196u

Study of Safety and Health Rehabilitation cranes (10 IU)

1,00515,45515,45304,5313,1059,08
Drafting the Study of Safety and Health for the work described in the project execution rehabilitation intervention cranes 10 inspection units, according to the provisions of Royal Decree 1627/97, 24 October, the Ministry of the Presidency.
%01a%Ancillary costs of labor0,024,59
%02%indirect costs0,0312,58
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0068hTechnical specialist. Professional Level II (Source: IVE). / More information1,9030,0057,0057,001,90
MOU0064hTechnical Assistant. Professional level V (Source: IVE). / More information4,9020,58100,84100,844,90
MOU0066hTechnical Coordinator. Professional Level II (Source: IVE). / More information1,3025,0032,5032,501,30
MOU0081hTechnical Director. Professional Level II (Source: IVE). / More information1,3030,0039,0039,001,30
RE0272uStaff time managing administrative proceedings1,3018,0823,5022,391,30
RE0280uDedication of a technical oversight and layout of documents0,8069,3055,4452,802,40
REU0763uAverage cost of premiums for professional liability insurance, per 1,000 currency units or technical fees fraction.1,0090,0090,00
REU0762uAverage cost of fees and contributions to the management and visa proceedings in a professional for every 1,000 currency units or technical fees fraction.1,00100,00100,00
observations:
It considers each inspection unit independent housing, local commercial use, warehouse, garage or any other use other than housing up to 200 m² of floor area or fraction thereof on the same level.
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 19/03/2018
zone València
observations: Partides relacionades: RE0179, RE0196, RE0197, RE0198.
..........
Validated by
profile
Validated date
observations:
Edit price