REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0205

Natural stone soil 60x30x2 cm, cement mortar, in extended.

1,0059,1359,1311,710,7019,80
Supply and placement of marble marble pavement, for interiors, 60x30x2 cm, polished finish; Received with M-5 cement mortar, work without delays. Even the continuous perimeter joints, the width not less than 5 mm, on the boundaries with walls, exempt pillars and level elevations, and, where appropriate, partition joints and structural or dilation joints existing in the support; Investing with the articular cement mortar, CG1, for minimum joints (between 1.5 and 3 mm), with the same tone of the pieces and cleaning.
%01a%Auxiliary costs on the labor0,020,23
%02%Indirect costs0,031,72
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0419National Marble Tile, Polishing Cream, 60x30x2 cm, according to UNE-EN 12058.1,0523,4524,62
REU0104CEM II/B-P 32.5 N Type M-5 Mortar of cement, work with 250 kg/m³ of cement and a proportion to volume 1/6.0,18115,5020,79
REU0112kgReaching mortar for coating, interior or exterior, natural stone, polished or polished, cement composed, arid with marble powder, pigments resistant to alkalis and special additives.0,031,880,06
MOU0033h1st Solidor Officer. Professional level VIII (Source: IVE). / More information0,3517,936,286,280,35
MOU0034hSolor Assistant. Professional level X (Source: IVE). / More information0,3515,505,435,430,35
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 20/03/2014
Zone València
Remarks:
..........
Validated by Francesc Company Gandia
Validated by date 20/06/2019
Remarks: CYPE RSP011 45,56 € 45,56. Ive Price (Ivory Cream) ersp1aakadB 701 €. Preu ACAE (sense comprovar) (crema d’ivori) ULEVBZBD 63,87 €.
edit price