REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0216m

Metal reinforcement concrete pillar 25x25 cm, with PNL40.4

1,00311,12311,12208,6713,9867,07
Strengthening support rectangular concrete dimensions of 25x25 cm confinamiemto lattice of four standardized profiles hot rolled steel S275 PNL-40.4 mm 2.42 kg / m according to UNE 10025-2 willing to support the edges and joined in platabandes all four sides by metal welded joint in situ, each 25 cm by constriction cooling even contribution of welding material according to UNE-EN ISO 2560, worked and placed.
%01a%Ancillary costs of labor0,023,53
%02%indirect costs0,036,87
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0311Healthy start on concrete pillars. Mortar structure.1,1065,2571,7832,111,98
REU0031kgMortar structural resins, Aplicatec R4 product in bags of 25 kg.9,500,656,18
REU0145kgSika Armatec top 110 Period-corrosion inhibitor and bonding can 4kg, three components: A + B + C.1,054,154,36
REU0438kgTwo-component adhesive based on epoxy resin for joining metal plates with hardened concrete, according to UNE-EN 1504-4.0,8916,9515,09
REU0439mSteel profile S275JR UNE-EN 10025 series L 40x4, hot rolled, structural applications. Made in studio and placed in work.4,752,6812,73
REU0444kgRolled steel plate UNE-EN 10025 S275JR in hot rolled flat profile of 20x4 mm, for structural applications.6,701,087,24
REU0440lFast drying primer formulated with modified alkyd resins and zinc phosphate.0,854,954,21
REU0161kgSolvent universal primer TKROM antixidante can 5 kg.1,451,772,57
REU0441hEquipment and auxiliary elements for electric welding.1,503,104,654,651,50
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information1,5014,3121,4721,471,50
MOU0055h1st Official editor metallic structure. Professional level VIII (Source: IVE). / More information4,5017,9380,6980,694,50
MOU0056hAssistant editor metallic structure. Professional level X (Source: IVE). / More information4,5015,5069,7569,754,50
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 24/03/2014
zone València
observations:
..........
Validated by Josep Mestre Ruiz
Validated date 9/06/2017
observations: Preu Cype EHP010 60,58 €. Preu IVE REHR11aabb 40,52 €. Preu ITeC (reforç de pilar de formigó amb perfils metàl·lics) K4S513A1 227,84 / m €. Preu ACAE (encolat de plaques d'acer planes sobre elements de formigó) UIBMM032U303 19,67 € / m.
Edit price