REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (h)MANAGER MANAGEMENT REPERCUSSION (%)
RE0216m

Metallic reinforcement of Pilar de Concrete 25x25 cm, with PNL40.4

1,00310,31310,31208,6713,9867,25
Reinforcement of rectangular reinforcement reinforcement of dimensions 25x25 cm for confinamiemto of trellis of 4 standardized wet steel profiles S275 PNL-40.4 mm of 2.42 kg / m according to UNE 10025-2 arranged in the edges of the support and united On the four faces by means of metal binding plates welded in situ, every 25 cm, by cooling constriction, even contribution of welding material according to UNE-EN ISO 2560, worked and placed.
%01a%Auxiliary costs on labor0,023,53
%02%Indirect costs0,036,87
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
RE0311Sanitated in boot of concrete pillars. Structural mortar.1,1064,5270,9732,111,98
REU0031kgStructural mortar of resins, product Applicatec R4, in bags of 25 kg.9,500,656,18
REU0145kgSika Top Armatec 110-EPOCEM inhibitor of corrosion and union bridge, can 4kg, 3 components: A + B + C.1,054,154,36
REU0438kgAdhesive of two components based on epoxy resin, for the union of metallic plateau with hardened concrete, according to UNE-EN 1504-4.0,8916,9515,09
REU0439mAcer's profile UNE-EN 10025 S275JR, series L 40x4, hot laminate, for structural applications. Made in workshop and placed in work.4,752,6812,73
REU0444kgUNE-EN 10025 S275JR laminated steel platinum, in hot laminated flat profile, 20x4 mm, for structural applications.6,701,087,24
REU0440lPrimation of fast drying, formulated with modified alkyd resins and zinc phosphate.0,854,954,21
REU0161kgUniversal Dolvent TKROM Print Print, can 5 kg.1,451,772,57
REU0441hTeam and auxiliary elements for electric welding.1,503,104,654,651,50
MOU0006hOrdinary pawn under construction. Professional Level XII (Source: Ive). / More information1,5014,3121,4721,471,50
MOU0055hOfficial 1st Metallic Structure Mounting. Professional level VIII (Source: Ive). / More information4,5017,9380,6980,694,50
MOU0056hAssistant Metallic Structure Assistant. Professional level X (Source: Ive). / More information4,5015,5069,7569,754,50
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 24/03/2014
Zone València
Observations:
..........
Validated by Francesc Company Gandia
Validated with date 20/06/2019
Observations: Preu Cype EHP010 91,05 €. Preu IVE REHR11aabb 40,52 €. Preu ITeC (sense revisar) (reforç de pilar de formigó amb perfils metàl·lics) K4S513A1 227,84 / m €. Preu ACAE (sense revisar) (encolat de plaques d'acer planes sobre elements de formigó) UIBMM032U303 19,67 € / m.
Edit price