REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0223m

Down lacquered steel storm D120

1,0024,2924,296,700,4127,58
Supply and installation of lacquered steel circular down for water collection, comprising preformed pieces with rivets bonding system and the joints sealed with silicone, placed flanged metal installed outside the building. Even w / w elbows, supports and special parts. Fully assembled, with connections made and tested by the installation company by the relevant testing service (included in the price). Including assembly and dismantling scaffolding hire certified or mechanical lifting equipment for proper installation.
%01a%Ancillary costs of labor0,020,13
%02%indirect costs0,030,70
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0466mDown lacquered steel circular, Ø 120 mm. Even w / w connections, elbows and special.1,1013,8015,18
REU0467uTo clamp down lacquered steel circular, Ø 120 mm.0,501,900,95
REU0465uAuxiliary for gutters and downspouts facilities evacuation lacquered steel.0,252,500,63
MOU0035hOfficial 1st plumber. Professional level VIII (Source: IVE). / More information0,2317,934,124,120,23
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,1814,312,582,580,18
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 24/03/2014
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price