REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0242

Rise of tile curve recovery.

1,0031,9931,9930,472,0595,25
Dismantling of cover ceramic tile and curved fasteners, placed mortar within 20 meters of height, in a sloping roof water; with manual means and material recovery of 50% for the subsequent location, being the order of execution of the reverse process of installation. Even w / w stacking, sorting, grading by size classes and condition, cleaning, removal and manual loading of the material produced during dismantling and demolition work, truck or container.
%01a%Ancillary costs of labor0,020,61
%02%indirect costs0,030,91
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information1,1014,3115,7415,741,10
MOU0023hPawn specialist in construction. Professional XI (Source: IVE). / More information0,9515,5014,7314,730,95
observations:
Recovery rating considerando a las Tejas 50% of the previous cleaning and hoard-room usable.
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 31/10/2014
zone València
observations: A00002-PK0016
..........
Validated by ?
profile ?
Validated date 00/00/0000
observations: Notes del validador?
Edit price