REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (h)Job Maging Repercussion (%)
RE0242

Teula rise Curva with recovery.

1,0031,9931,9930,472,0595,25
Dismantling of curved ceramic tile cover and fixing elements, placed with mortar less than 20 meters in height, in an inclined roof to a water; With manual media and recovery of 50% of the material for its subsequent location, being the order of execution of the reverse process to that of its installation. Even P / P of stacking, selection, classification by sizes, classes and state of conservation, cleaning, withdrawal and manual load of disassembled material and demolitions produced during work, on truck or container.
%01a%Auxiliary costs on labor0,020,61
%02%Indirect costs0,030,91
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
MOU0006hOrdinary pawn under construction. Professional Level XII (Source: Ive). / More information1,1014,3115,7415,741,10
MOU0023hPawn specialist in construction. Professional Level XI (Source: Ive). / More information0,9515,5014,7314,730,95
Observations:
Evaluation Considering a recovery of 50% tejas, previous limpieza and acopio of the aprovective piezas.
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 31/10/2014
Zone València
Observations: A00002-PK0016
..........
Validated by Francesc Company Gandia
Validated with date 11/07/2019
Observations: Preu Cype DQC040 10,77 €. Preu IVE CSSV.2a 224,32 €.
Edit price