REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionQuantityPrice (€)Amount (€)Jobmane repercussion (€)Workforce (H)Job Maging Repercussion (%)
RE0260m

Assembly and disassembly of the scaffolding hanging, on the external façade.

1,0051,6051,60
Mountains and disassembled scaffolds hanging on the facade at 25 ml, including installation with superior counterweights, maintenance, lowest protection tray, security and transportation systems.
%01a%Auxiliary costs on labor0,02
%02%Indirect costs0,031,02
%Estimation of degree of difficulty or uncertainty (normal: 1.00)1,00
REU0088uMounting platform for motorized traction suspended, 2 m in length, formed by one or more modules of 90 cm wide, to work on vertical walls of up to 30 m in height, composed of bordering, railing, platform elevation , cables and suspension of the structure, autumn system, suspension removal and other security devices.0,06335,0020,10
REU0089uDisassembly of the suspended motorized traction platform, 2 m in length, formed by one or more modules of width of 90 cm, to work on vertical walls of up to 30 m in height, composed of bordering, railings, platform lift , cables and suspension of the structure, fall system, suspension removal and other security devices.0,04279,009,77
REU0091uTransport and elimination of motorized traction platform suspended, 2 m in length, formed by one or more width modules of 90 cm, to work on vertical walls of up to 30 m in height, composed of bordering, railings, elevators , cables and suspension structure, autumn system, suspension disposition and other security devices.0,02210,004,20
RE0107uAssembly and dismantling of tent for pedestrian rhythm. 15 ml stretch.0,03550,1716,51
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 22/01/2015
Zone València
Observations: AO0009
..........
Validated by ?
Profile ?
Validated with date 00/00/0000
Observations: Notes del validador?
Edit price