REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0265u

Project writing in repair constructive element (1 UI)

1,00592,01592,01377,4517,5063,76
Editing of the execution project for the repair of a constructive element with an intervention in 1 inspection unit, consisting of the visit of the data technician, documentation of the current state, study and evaluation of the deficiencies detected and Description of the repair of the constructive element. Includes: visits and displacement, document report, conditions, budget and plans.
%01a%Auxiliary costs on the labor0,021,10
%02%Indirect costs0,037,35
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0174uDedication of a technician to the writing of section, section or annex of memory1,0087,9287,9283,744,00
RE0175uDedication of a technician to the writing of section, section or annex of specifications1,0066,3166,3163,163,00
RE0176uDedication of a technician to the writing of section, section or annex of budget1,0087,9287,9283,744,00
RE0177uDedication of a technician to the preparation of graphic documentation of a section1,0085,6085,6081,524,00
RE0178uDedication of a technician to data taking or current state in an inspection unit, without displacement1,0010,8110,8110,290,50
MOU0066hTechnical coordinator. Professional level II (Source: IVE). / More information1,0025,0025,0025,001,00
MOU0081hTechnical director. Professional level II (Source: IVE). / More information1,0030,0030,0030,001,00
REU0763uAverage cost of professional liability insurance premiums, for every 1000 units of technical fee currency or fraction.1,0090,0090,00
REU0762uAverage cost of rates and contributions for the management and visa of a file in a professional college, for every 1000 units of coin of technical fees or fraction.1,00100,00100,00
Remarks:
Each group of constructive elements with similar characteristics is considered a constructive element that can be treated in a homogeneous and unitary manner (for example: doors, windows, beams, slabs, etc.). The cost of coves to be executed, if applicable, is not included in this game. Each accessible and covered space is considered an independent inspection unit (home, shopping premises, warehouse, parking, common element or any other use), up to 200 m² of built area or fraction, at the same level .
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 18/03/2018
Zone València
Remarks: Partides relacionades: RE0265, RE0266, RE0267, RE0268, RE0269, RE0270, RE0294, RE0295 i RE0296.
..........
Validated by
Profile
Validated by date
Remarks:
edit price