WORK DIRECTION IN REPAIR CONSTRUCTIVE ELEMENT (1 UI)

1,00356,56356,56132,006,0037,02
Direction of the works described in the project of execution for the repair of a construction element with an intervention in 1 inspection unit. Includes: visits to work, drafting complementary documents, control of work certifications, issuing the final certificate of work and writing of the final state document of the works.
%01a%Auxiliary costs on the labor0,020,44
%02%Indirect costs0,036,36
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0186uVisit to the works director, even travel2,0068,88137,76110,005,00
MOU0063hTechnician. Professional level III (Source: IVE). / More information1,0022,0022,0022,001,00
REU0763uAverage cost of professional liability insurance premiums, for every 1000 units of technical fee currency or fraction.1,0090,0090,00
REU0762uAverage cost of rates and contributions for the management and visa of a file in a professional college, for every 1000 units of coin of technical fees or fraction.1,00100,00100,00
Remarks:
Each group of constructive elements with similar characteristics is considered a constructive element that can be treated in a homogeneous and unitary manner (for example: doors, windows, beams, slabs, etc.). Each accessible and covered space is considered an independent inspection unit (home, shopping premises, warehouse, parking, common element or any other use), up to 200 m² of built area or fraction, at the same level .
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 18/03/2018
Zone València
Remarks: Partides relacionades: RE0265, RE0266, RE0267, RE0268, RE0269, RE0270, RE0294, RE0295 i RE0296.
..........