CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0281u

Interior electrical installation for single family

1,002.898,052.898,051.524,0585,0052,59
Electrical installation inside a family house, consisting of general command and protection panel for single family, consisting of cash recessed insulating material opaque door for hosting power control switch (ICP) (not included in this price) in separate compartment and sealed and the following devices: first switch device (IGA) cutting omnipolar, three circuit breakers 40 a, two breakers breakers 10 a, two breakers breakers 16 a, 1 breaker 25 a circuit breaker for protection of these internal circuits (not included in the price): 1 lighting circuit, the first circuit sockets, one circuit for air conditioning, emergency lighting circuit 1, the first circuit closing automated. Installation of 85 breakpoints, and switching sockets, including lights, cables, manholes and standard quality mechanisms.
%01a%Ancillary costs of labor0,0230,48
%02%indirect costs0,0383,52
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0714uOverall picture of control and protection for single-family, consisting of cash recessed insulation door opaque for accommodation of switch power control (ICP) (not included in the price) in separate compartment and sealed and the following devices 1 switch device (IGA) cutting omnipolar, three circuit breakers 40 a, two breakers breakers 10 a, two breakers breakers 16 a, 1 breaker breaker 25 a, for protecting these circuits inside (not included in the price): 1 lighting circuit, the first circuit sockets, one circuit for air conditioning, emergency lighting circuit 1, the first circuit closing automated.1,00240,00240,00
REU0591uMaterial for electrical installation of a breakpoint, or switching socket, including impact of lights, cables, manholes and standard quality mechanisms.85,0012,001.020,00
MOU0031hOfficial 1st electrician. Professional level VIII (Source: IVE). / More information85,0017,931.524,051.524,0585,00
written by Joaquim Iborra Posadas
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 7/02/2017
zone València
observations:
..........
Validated by
profile
Validated date
observations:
Edit price