REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0285u

Drafting project Installation Thermal Energy (20 UI)

1,001.091,051.091,05852,7234,0478,16
Writing of the thermal energy installation project, for a building or premises with an intervention in 20 inspection units, in accordance with the provisions of the CTE Technical Code ( RD 314/2006) and the Regulation of thermal installations in the RITE buildings (RD 1027/2007). Includes: Document report, conditions, budget and plans. / More information
%01a%Auxiliary costs on the labor0,0217,05
%02%Indirect costs0,0331,28
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
MOU0068hSpecialist technician. Professional level II (Source: IVE). / More information14,0830,00422,30422,3014,08
MOU0064hTechnical assistant. Professional level V (Source: IVE). / More information17,0820,58351,44351,4417,08
MOU0066hTechnical coordinator. Professional level II (Source: IVE). / More information1,4425,0035,9035,901,44
MOU0081hTechnical director. Professional level II (Source: IVE). / More information1,4430,0043,0843,081,44
REU0763uAverage cost of professional liability insurance premiums, for every 1000 units of technical fee currency or fraction.1,0090,0090,00
REU0762uAverage cost of rates and contributions for the management and visa of a file in a professional college, for every 1000 units of coin of technical fees or fraction.1,00100,00100,00
Remarks:
Each accessible and covered space is considered an independent inspection unit (home, shopping premises, warehouse, parking, common element or any other use), up to 200 m² of built area or fraction, at the same level .
Written by Joaquim Iborra Posadas
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 19/03/2018
Zone València
Remarks: Partides relacionades: RE0285, RE0286, RE0287, RE0288, RE0289, RE0290, RE0291.
..........
Validated by
Profile
Validated by date
Remarks:
edit price