CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0302m

Structural reinforcement forged pipe system Herms CR DIT 289 / R 100x100x4.

1,00137,87137,8748,073,3034,87
Reinforcing wrought comprised: - Shoring of the affected area to repair, if necessary. - Demolition of walls affected a height not exceeding 35-40 cm. (Removal of debris, loading and transport to landfill) even replenishing it once held reinforcement. - Chopped coating beams along the entire length, removal of debris, loading and transporting debris to landfill. - Diverting electricity or plumbing installations affected. - Lifting materials. - Priming the underside of the beam of concrete with epoxy resin Sikadur 32 FIX. - Installation of concrete beam in each of the first row of M8 70 mm long bath prior epoxy resins. - Placement with ancleje chemical metal plates posttensió house commercial HERMS S.A. - Installation of metal profile galvanized steel tubes and 100x100x4 90x90x4 with two rows of upper metal connectors - System HERMS D.I.T. 289 (together by screws socket with a minimum of 45 cm), with a top layer of mortar controlled retraction SIKA TOP 122 until after the spill the sides award posttensió screws - available two lines of barriers corrugated steel AEH-B500SD 10 mm on each side of the joints between the sections of beam extentible - Delete shoring. - Protection of metallic elements (profiles and plates) by projection of rock wool or similar with a minimum thickness of 3-4 cm across its contour.
%01a%Ancillary costs of labor0,020,54
%02%indirect costs0,032,77
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0301uSupply and installation anchor plate Herms DIT-289.0,5432,6417,632,770,17
RE0141mPerforated gypsum underside of the beam1,003,683,683,500,37
REU0256mHerms DIT extensible beam 289 and tubular profile 100x100x4 galvanized 90x90x4, with two rows of upper metal connectors1,0033,0033,00
RE0144Shoring concrete beam forged.0,505,332,671,940,12
RE0143mHealthy structural concrete beam underside.1,0018,2818,2812,820,94
REU0258uDiverting electricity or plumbing installations affected installing reinforcement beams0,2514,003,50
REU0257mDemolition of walls to open hollow beams interns reinforcement system Herms DIT 289, including capping and replacement of it, lining and finished with plastering.0,1516,002,40
REU0253kgMortar sikatop 122 / s, 28 kg bag.6,201,599,86
REU0259kgSikadur 32 Fixed bridge reinforcement beams forged union0,0126,710,21
REU0260uConnector system M6x70 Herms DIT 2895,000,080,40
REU0254uHerms gun applicator system DIT 2890,1033,003,17
REU0255uPort Work Support Herms DIT 2892,151,352,90
REU0262Fireproof mineral fibers with metallic profiles for EF90 and 3-4 cm thick medium.0,4024,559,82
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,7517,9313,4513,450,75
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,9514,3113,5913,590,95
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 27/11/2013
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile Notes del validador?
Validated date 00/00/0000
observations: Notes del validador?
Edit price