CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0305m

IPE-20/140 forged Reinforcement

1,00132,56132,5664,054,2948,32
The wrought reinforcement consisting of: - Sodrat of the area affected by the repair, to be necessary. - Demolition of the affected partition at a height of not more than 35-40 cm. (Removal of Broady, loading and transportation to landfill) Even replacement and coatings after reinforcement. - Coating of Viguet cut to all its length, removal of waste, load and transport of waste to landfill. - Affected electricity device or plumbing installations. - Elevation of materials. - Placement with chemical anchors of the SP3500 Metal Postage Model of the Casa Co-Mericial Herms S.A. Through the previous location of the anchor armor with Pachometro, sitting on the mortar layer without retraction - placement of the metal profile of a -42b steel and the slightly pressure on the mortar until the mortar. Above the upper wings are poured. - Deleting the plot. - Painted beams and plates with a layer of at least 70 anti -printed microns -Corrosive in zinc phosphate, prior review and welding retouching. - Final repaint in Chlorocaucho with a minimum thickness of 60 microns. - Protection of metal elements (profiles and plates) by projection of rock wool or symptoms with a minimum thickness of 3 cm. In all its contour. Note: The metal reinforcement profiles will be IPE140 for lights up to 3.60 m, IPE160 for strong between 3.60 and 4.20 m, IPE180 for lights between 4.20 and 4.90 m, IPE200 for lights above 4.90 m.
%01a%Auxiliary costs on the labor0,020,71
%02%Indirect costs0,032,06
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
RE0135uSupply and placement Hermon Anchor0,6644,5829,423,740,22
RE0141mPlaster chopper of the lower face of the mouth1,003,683,683,500,37
RE0144Running of horizontal slab shoring0,4521,839,828,710,54
RE0143mVigue concrete structural loss of health.1,0018,2818,2812,820,94
REU0258uAffected electricity or plumbing facility device when installing0,2514,003,50
REU0257mDemolition of the partition for the opening of holes to the inmates, the Herm reinforcement system called 289, even connected and replaced and ending with the plaster coating.0,1516,002,40
REU0031kgMortar of structural resins, R4 applied product, in bags of 25 kg.5,250,653,41
REU0173kgSteel coiled UNE-EN 10025 S-275-JR, in a simple piece of hot laminated profiles of the IPN, IPE, HeB, HEB, HEM and UPN series, worked in a workshop, applied in structural reinforcements.12,940,7910,22
REU0030kgTKROM HOUSE PAINT, 25 kg boat, anthocorrosive printing S/R Gray 411 or similar.1,552,093,24
REU0161kgUniversal solvent TKROM Anti -lidante Printing, boat 5 kg.0,021,770,04
REU0032mRoca Roca Ignipated Roca Roca Mineral Fibers on the IPE-20 profile.0,8212,8010,50
MOU0005h1st officer under construction. Professional level VIII (Source: IVE). / More information0,9717,9317,3917,390,97
MOU0006hOrdinary pawn under construction. Professional level XII (Source: IVE). / More information1,2514,3117,8917,891,25
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 27/11/2013
Zone València
Remarks: Notes de l'autor?
..........
Validated by ?
Profile Notes del validador?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price