CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0307m

Demolition of existing reinforcement IPE120-140

1,0025,9825,9810,440,8040,18
Demolition reinforcement under forged rolled base type or similar IPE120-140 two separate 80-100 cm each, consisting of the cut in the area of ​​anchor plates; and removing the anchor plates to prevent the further strengthening of the floor; with debris removal and loading, excluding transport to the landfill, according NTE / ADD-12
%01a%Ancillary costs of labor0,020,16
%02%indirect costs0,030,65
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0144Shoring concrete beam forged.0,655,333,462,520,16
REU0263mStrengthening retirement with IPE120-160 profile, cut and perforated plate and profiles1,0012,5012,50
REU0022dRental mola large manual cutting discs0,086,100,49
REU0067hEquipment and auxiliary elements for electric welding.0,053,090,150,150,05
REU0182hTeam flame cutting with acetylene as fuel and oxygen as supporter of combustion.0,167,371,181,180,16
REU0264uHilti electric demolition hammer / Kango.0,0516,000,80
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,1217,932,152,150,12
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,3114,314,444,440,31
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 27/11/2013
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile Notes del validador?
Validated date 00/00/0000
observations: Notes del validador?
Edit price