REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0308m

High fiber cement, with waste management.

1,0079,3979,39
Decreased augmented fiber without recovery, even withdrawing waste or burden of trucks or containers, even projects, efforts, licenses, procedures, waste management, removal of waste, loading and transportation to authorized landfills (including the Dumping cannons).
%01a%Auxiliary costs on the labor0,02
%02%Indirect costs0,032,31
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0265mDismantling of fiber cement decrease and fixation elements, for a medium length that disassembles 26 to 100 m, plasticized, labeling and palletized of the elements, with appropriate means and equipment and mechanical load of the dismounted material in the truck or in the container. .1,1062,7068,97
REU0266Transportation of fiber cement plates, from the demolition of a roof, to a specific landfill, the installation of the construction of the construction and the external demolition to the work or center of recovery or disposal of waste , previously plasticized, palletized and loaded in the truck truck, considering the first stage, unloading and returning.0,0395,203,05
REU0267Delivery to an authorized manner of hazardous waste from fiber cement plates, from the demolition of a roof, including the cost of high.0,03158,005,06
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 27/11/2013
Zone València
Remarks: Notes de l'autor?
..........
Validated by ?
Profile Notes del validador?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price