CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0310m

Structural repair of concrete in front of forged 35 cm.

1,0036,0036,0017,481,1048,56
Repairing front forged in balconies and terraces with removal of the entire coating was deficient by mechanical or manual to get at least reinforced steel oxidation causes the peeling. It will clean out this armor oxide in its entirety and contour by sandblasting or brush fence, for subsequent passivation using an appropriate pasivante types SIKA TOP 108 or similar, in two layers and regeneration , to reconstruct the original form of the piece to repair with a mortar or similar type Monotop 650 prior surface treatment of existing concrete type latex emulsion adhesion. If you need to have reached an excessive degree of oxidation, will be replacing the frames needed for other similar features at least, even loading and transport of debris to landfill authorized.
%01a%Ancillary costs of labor0,020,35
%02%indirect costs0,031,03
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
REU0264uHilti electric demolition hammer / Kango.0,1816,002,88
REU0145kgSika Armatec top 110 Period-corrosion inhibitor and bonding can 4kg, three components: A + B + C.0,954,153,94
REU0031kgMortar structural resins, Aplicatec R4 product in bags of 25 kg.15,500,6510,08
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,4817,938,618,610,48
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,6214,318,878,870,62
RE0126Transport of inert materials and / or concrete container.0,0134,810,24
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 27/11/2013
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile Notes del validador?
Validated date 00/00/0000
observations: Notes del validador?
Edit price