REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0330m

Changing down inside PVC-160 and B-lined masonry.

1,00136,42136,4237,452,3027,45
Change of drainpipes consisting opening Dec. local partitions not wet (bedrooms, dining rooms ...) removing old vents, placement of new drainpipes diameter 125/160 PVC glued together, connecting drains of devices existing partitions closing of realizing through appropriate employment and replacement of siding with fiberglass mesh, even cleaning escobros loading and transport to landfill.
%01a%Ancillary costs of labor0,02
%02%indirect costs0,030,53
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
RE0040Demolition of factory coated interior partition, 4/5/7 cm thick.1,155,266,055,760,40
RE0331mLowering health series B indoors with PVC-pipe 160.1,0529,1930,655,400,32
REU0321uConnection of Desagües Aparatos of existing dwelling cambio por bajante of interior PVC0,2570,0017,50
RE0047Partition inner coating for ceramic brick factory LH7.1,1523,1126,5810,630,66
RE0052Tiling porcelàniques placed tile adhesive cement glue.1,1544,5951,2815,660,92
RE0126Transport of inert materials and / or concrete container.0,1134,813,83
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 27/11/2013
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile Notes del validador?
Validated date 00/00/0000
observations: Notes del validador?
Edit price