REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0331m

Downspout Health B series inside, with PVC-160 pipe.

1,0029,1929,195,140,3017,61
Supply and assembly of the inner descent of the waste water evacuation network, consisting of PVC tube, series B, 160 mm in diameter and 3.2 mm thick. Even P/P of auxiliary material for the assembly and subject to the work, accessories and special parts placed by joined united with adhesive. Completely mounted, connected and proven by the installation company through the corresponding service tests (included in this price).
%01a%Auxiliary costs on the labor0,020,10
%02%Indirect costs0,030,85
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
REU0314uAuxiliary material for the assembly and subject to the work of PVC Pipes, BS series, 110-160 mm in diameter.1,002,122,12
REU0315mPVC tube, series B, 160 mm in diameter and 3.2 mm thick, according to UNE-EN 1329-1, with the price increased by 40% for accessories and special pieces.1,0019,8119,81
REU0316lLiquid cleaning to paste -s through the PVC bath and accessory adhesive.0,069,580,57
REU0317lPVC pipe accessories and accessories.0,0319,850,60
MOU0035h1st Officer of Fontanero. Professional level VIII (Source: IVE). / More information0,2017,933,593,590,20
MOU0039hAssistant of Fontanero. Professional level X (Source: IVE). / More information0,1015,501,551,550,10
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 27/11/2013
Zone València
Remarks: Notes de l'autor?
..........
Validated by ?
Profile Notes del validador?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price