REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CodeOneDescriptionAmountPrice (€)Amount (€)Impact of labor (€)Labor (h)Impact of labor (%)
RE0338u

PVC-1110 Substitution of the horizontal toilet, dimensions 250x250 mm.

1,00103,73103,7315,240,8514,69
SIP SIFONIC SIP for flat covers with a horizontal exit of diameter of 110 mm and 250x250 mm, and with a PVC zip stabilized against ultraviolet radiation and thermal shock, according to UNE-IN 1253, even withdrawn. of the damaged toilet, made to drain from the general network, fully installed and demonstrated according to DB-HS-D of the CTE, cleaning, loading and removal of rubble in the truck or in the container and without transport to landfill
%01a%Auxiliary costs on the labor0,020,30
%02%Indirect costs0,033,01
%Estimation of the degree of difficulty or uncertainty (normal: 1.00)1,00
MOU0035h1st Officer of Fontanero. Professional level VIII (Source: IVE). / More information0,8517,9315,2415,240,85
REU0386uPVC SINK Horizontal, 110 mm in diameter and dimensions 250x250 mm1,0020,1020,10
REU0387mPVC B Evacuation Tube, 100 mm diameter, 50% in accessories1,506,7210,08
REU0373uElevated summary without coating, chopped of the forged surface with electric hammer and preparation of the hole for the new installation.1,0055,0055,00
Company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
Update 12/03/2014
Zone València
Remarks: Notes de l'autor?
..........
Validated by ?
Profile Notes del validador?
Validated by date 00/00/0000
Remarks: Notes del validador?
edit price