REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
CODEUDESCRIPTIONQUANTITYPRICE (€)Amount (€)IMPACT OF LABOR (€)MANPOWER (H)IMPACT OF LABOR (%)
RE0340

Healthy sills and wall waterproofing coronation.

1,0045,2545,259,670,6021,37
Chopped interior and exterior areas of the bib deck and cassette are damaged access (estimating a maximum performance of 30% of the total area), with replacement of waterproofing sheet, welded the existing ridges replacement of broken plaster mortar without shrinkage and high strength even removal of rubbish bags and cargo container for transport to landfill authorized.
%01a%Ancillary costs of labor0,020,19
%02%indirect costs0,031,31
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,3017,935,385,380,30
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,3014,314,294,290,30
REU0382uCavalló pottery, 20x23x4 cm4,002,329,28
REU0366Cement mortar M-15, made by hand in small boats.0,00128,950,39
REU0353Cement grout colorant0,00569,910,57
REU0362Crushed cement mortar horizontal household0,3515,815,53
REU0381Chopped manual interior cement wall thickness <= 3 cm0,359,883,46
REU0339mWaterproofing coronation of the front wall1,005,935,93
REU0383Plastering mortar M-5 high-strength 2 cm thick manual0,3525,488,92
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 14/03/2014
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile Notes del validador?
Validated date 00/00/0000
observations: Notes del validador?
Edit price