RE0348

Training during lightened concrete 11 cm thick

1,0021,5521,5511,290,7052,39
Training slope flat roof with 11 cm thick concrete using lightweight cellular concrete products and force alleugerants, finished layer of 1.50 cm cement mortar for regularization pending even demolition damaged during training, reframing, proportion of envanets guides and limes, evened the same shrinkage, breakage, whirlpools mortar and cleaning, according NTE / QA, debris removal and loading truck or container without transport to landfill
%01a%Ancillary costs of labor0,020,23
%02%indirect costs0,030,62
%Estimating the degree of difficulty or uncertainty (normal 1.00)1,00
MOU0005hOfficial 1st in construction. Professional level VIII (Source: IVE). / More information0,3517,936,286,280,35
MOU0006hOrdinary laborer in construction. Professional XII (Source: IVE). / More information0,3514,315,015,010,35
REU0355uSimple cm hollow brick 24x11,5x42,000,140,28
REU0356uCm of brick 24x11,5x72,500,170,43
REU0366Cement mortar M-15, made by hand in small boats.0,02128,952,19
REU0340cellular concrete0,1255,366,42
REU0357Demolition layer for forming concrete lightened slope, average thickness between 5 and 11 cm0,024,340,09
company: REHABI-LI-TAR. Gestió i promoció de la rehabilitació SLU
update 12/03/2014
zone València
observations: Notes de l'autor?
..........
Validated by ?
profile Notes del validador?
Validated date 00/00/0000
observations: Notes del validador?
Edit price